Identify the site and the plants affected
Postentry quarantine allows certain imported planting stock to be grown at an approved site and inspected for pests. APHIS says the final destination of postentry taxa is limited to states with a postentry quarantine agreement. This is a specific import quarantine arrangement; a general nursery license or certification does not establish the status of a particular shipment.
Ask the operator whether any postentry material is present or expected. Obtain the PPQ Form 546 growing agreement and permit conditions, shipment and inspection records, site plans, and any release or movement documents. Match scientific names, shipment identifiers and growing locations to the area proposed for solar use. The landowner, importer, operator and person holding occupancy rights may be different parties.

Confirm release or permission before a move
APHIS says quarantine is generally two years, with exceptions for some species. The applicable agreement, permit and current requirements matter for each shipment. Time elapsed, a planned final inspection or an inspector’s recommendation is not itself evidence of release. The APHIS inspector manual describes PPQ Form 569 as the formal release notice; ask the importer to obtain the documentation and verify that it covers the affected material.
The PPQ 546 agreement states that material will not be moved or distributed without prior written permission of the appropriate state or territory official and, where required by the agreement, the APHIS postentry quarantine program coordinator. If a move is proposed before release, have the importer contact those officials about the proposed destination and obtain the necessary written authorization before any movement. Do not assume a sale, lease, closing or new owner transfers the agreement or authorizes a relocation.
If the records do not reconcile, plants remain under quarantine, or an official requires further observation, keep the affected area and access available while the importer and officials resolve the status. Do not set a solar start date based on an assumed outcome.
Map the growing site against the solar footprint
With the operator, mark the approved growing locations, greenhouses or other growing structures, inspection access, gates, routes, water and power on a shared plan. Compare them with proposed fencing, equipment pads, cables, roads, laydown space and construction traffic. Review temporary survey and geotechnical access as well as the final leased or sold area.
Ask the importer and officials what continued supervision, access and site conditions are needed until release or an authorized move. Coordinate any proposed change to fencing, utilities or access with the people responsible before it occurs. A site outside the panel footprint may still be needed for the quarantine operation or official inspections.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landTurn the transition into sale or lease terms
For a lease, distinguish limited preliminary entry from exclusive possession and construction. For a sale, distinguish closing from possession and address any retained rights. Have counsel review the growing agreement, land occupancy documents and proposed solar terms together; a landowner may not be able to end another party’s rights simply by signing a solar agreement.
Assign who obtains and reviews shipment-specific release notices or movement permissions, who coordinates with officials, and who pays for approved transition arrangements. Define which areas remain available and who maintains access and utilities. Include a realistic schedule, notice process and agreed consequences if approvals or the transition take longer than expected.
Before handover, reconcile the actual plants and locations with the records and document that the agreed conditions have been met. A release of one shipment does not establish release of every other shipment at the site.
Discuss the opportunity with Sunland
Sunland considers solar land opportunities nationwide, including potential sales and leases. Share the property location, approximate acreage, current growing use and whether you own or operate the site. Mention the quarantine arrangement and the areas or dates that remain uncertain, without sharing sensitive business records until the appropriate parties agree.
Ask what access, acreage and possession timeline the proposal requires and how a delayed release or authorized move would affect it. Sunland may contract for an opportunity and assign it to a specialist. An inquiry does not itself grant access or establish project approval, a utility connection or a completed transaction.
Questions landowners ask
Does two years mean the plants are released?
No. APHIS describes the period as generally two years with exceptions. Confirm the shipment-specific formal release; elapsed time or a recommendation is not the release itself.
Can the plants be moved so solar construction can begin?
A move before release requires the applicable prior written permission. The importer should coordinate the proposed move with the appropriate state or territory official and, where required by the agreement, the APHIS postentry quarantine program coordinator before moving the material.
Can an owner discuss a solar sale or lease while quarantine continues?
Yes. Identify the people and areas involved and make access, closing and possession fit the actual rights and documented release or authorized movement.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.