Landowner guide

How can a partial solar sale or lease affect Reclamation irrigation reporting?

A partial solar sale or lease can change the acreage, parcels or parties reported for a farm served by a federal Reclamation project. Before signing, check the district records and the transaction footprint so the remaining farm can continue to meet its irrigation water requirements.

The short answer

Ask each affected irrigation district and, where needed, Bureau of Reclamation acreage limitation staff whether the land is nonexempt irrigable or irrigation land and how the proposed transaction affects each holder’s forms. Compare the current filings and parcel records with the proposed sale or lease, identify who must report and when, and make the transaction schedule accommodate those steps. A solar use does not by itself establish that land is nonirrigable or exempt.

Start with the land and the district records

This guide concerns acreage limitation and landholder reporting on a Reclamation project farm. Not every solar property or lease is subject to these provisions. Ask the irrigation district whether its contract and the particular land are subject to federal acreage limitations, whether an exemption applies, and which district or Reclamation office can confirm the answer. A change of use or an absence of current irrigation does not alone determine classification.

Reclamation generally describes irrigable land as land that is, can be, or is planned to be provided Reclamation irrigation water through existing or planned facilities. Irrigation land generally receives Reclamation irrigation water for agricultural purposes, subject to exceptions. Request the district’s current acreage and classification records, water delivery and assessment records, project and parcel maps, and the most recent RRA forms and correspondence. Ask how the records treat each part of the proposed footprint and the retained farm.

Illustration of a land parcel and surrounding landscape

Compare the deal with the landholding on file

Draw the proposed sale boundary or lease area over the district map and the current farm parcels. Include fenced areas, roads, equipment areas and any separately occupied acreage. Record the proposed effective date, acreage, legal descriptions, owner, buyer or lessee and any sublease or assignment. Reconcile those details with deeds, existing agricultural leases, ownership entities and the forms already filed. A survey or district review may be needed if the acreage or boundaries do not match.

A change in acreage or parcels owned or leased, the identity of a lessor or lessee, or the term or effective date of a lease can be a landholding change. Ownership through a trust or entity and interests held indirectly can matter too. Ask the district and Reclamation whether the particular solar agreement creates a reportable lease or other landholding change, who is affected and what evidence they need. Do not assume that every option, access agreement or solar lease has the same treatment.

Identify the holders, forms and deadlines

Determine separately whether the owner, buyer, solar lessee, farm tenant, entity owners or farm operator must file. Reclamation’s filing thresholds depend on the holder’s status, applicable district category and total nonexempt land held directly or indirectly across the 17 western project states; trust, estate and farm-operator rules need separate attention. Ask each district for its current category and the correct current-year official forms and instructions. The seller or lessor should notify the buyer or lessee of applicable filing requirements; each responsible party should confirm its own filing.

For a covered landholding change during the irrigation season, Fact Sheet 11 generally calls for notice to the district or districts within 30 calendar days and a new standard RRA form to all districts where land is held within 60 calendar days. If the season ends before the 60th day, the fact sheet instead calls for the new form before receiving Reclamation irrigation water in a water year following the change. For an outside-season change, it likewise calls for the new form before water is received in a following water year. Ask the district how these rules and any specific exceptions apply to the facts and preserve evidence of notice and filing.

A new landholder required to file must submit the required standard form to all districts where land is held before receiving any Reclamation irrigation water; the 60-day period is not a universal grace period for a new holder. Required annual forms must be on file before water deliveries for the water year. Obtain Form 7-21INFO and the official forms and instructions for the relevant water year from the district or Reclamation; check the edition and expiration date before using them.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Protect water eligibility for the retained farm

Have the district review the post-transaction acreage and holders for both the solar tract and the remaining farm. Ask whether amended filings, excess-land or full-cost designations, or other determinations are needed before the next delivery. A filing is a condition where required, but it does not itself guarantee water eligibility. Resolve discrepancies in writing with the district rather than assuming that removing acreage from a deed or lease automatically removes it from the RRA records.

Map the irrigation facilities and routes needed by the retained farm and coordinate any separate district approvals for changes or access. This reporting review does not itself grant permission to cross a canal, change district boundaries, transfer a water right or modify a state-law place of use. Check those distinct issues with the district and applicable advisers when the actual plan raises them.

Put the reporting transition into the transaction

Before signing, use counsel and the district’s guidance to identify a reporting contact for each party, access to necessary parcel and entity information, the intended effective date and who submits each notice and form. Set milestones for the district review, required submissions and confirmation before possession or water delivery as applicable. Address the cost and consequences of a delayed or changed footprint, and protect private ownership and taxpayer information when exchanging records.

At closing or lease commencement, reconcile the final executed documents and acreage against the district submission. Keep copies of the notice, forms, delivery receipts and district responses with the farm records. Calendar annual filings and any later assignment, sublease, acreage or term change for another review; district and Reclamation staff can identify what is required in the specific circumstances.

Discuss the opportunity with Sunland

Sunland considers solar land opportunities nationwide, including potential sales and leases. Share the property location, approximate acreage, current agricultural use and known district or reporting constraints. Agree with the appropriate parties before sharing confidential records.

Ask what acreage, entry rights and timing the proposal requires and how the retained farm will be accommodated. Sunland may contract for an opportunity and assign it to a specialist. A conversation does not itself grant access, establish water eligibility or complete a transaction.

Questions landowners ask

Does a solar lease automatically remove land from RRA reporting?

No. Ask the district and Reclamation how the particular agreement and land classification are treated. The solar use alone does not establish an exemption or nonirrigable status.

Does a new buyer or lessee always have 60 days to file?

No. A new landholder who must file must submit the required form before receiving Reclamation irrigation water. Check the applicable district and filing status.

Can the retained farm continue receiving water?

That depends on its eligibility and compliance, including required filings and any other applicable conditions. Have the district review the final transaction and retained acreage before delivery.

Is the reporting threshold the same for everyone?

No. It depends on landholder status, the district category and westwide nonexempt holdings, with separate instructions for trusts, estates and certain farm operators.

Sources & further reading

Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.