Landowner guide

A tank was removed: what should a solar land seller check?

A removed underground fuel tank does not, by itself, establish that a release was cleaned up or that a proposed solar footprint is ready for construction. Before agreeing to a purchase option, gather the tank closure and site assessment records, check whether there is a separate release case, and ask the implementing agency about its current status.

The short answer

Locate the former tank and piping on a site plan, obtain the complete assessment and any agency correspondence, and compare them with the proposed panels, foundations, roads and cable routes. Ask the responsible agency what the case records say and whether continuing obligations or further review apply. An environmental professional and your attorney can help evaluate the documents and proposed option.

Separate tank closure from release cleanup

Find the tank identification number, removal or closure documentation, site assessment, sampling results and correspondence. EPA describes an assessment for contamination as part of permanent closure of regulated underground storage tanks. EPA also describes corrective action for releases separately. A removal invoice alone is not a substitute for either set of records.

Ask whether a release was reported and request the case number, investigation and cleanup records, and any decision or closure letter. Read the actual decision and its conditions; do not infer a release case is closed simply because the tank was removed. Records may describe only a portion of a property or a particular release.

Illustration of a land parcel and surrounding landscape

Ask the agency about the present status

Give the agency the address, former business names, tank identification and any case number. Ask whether its records identify an open release case, what decision applies, and whether monitoring, land-use controls or other obligations remain. Request the underlying documents and ask how to verify whether the file is complete.

EPA says states and territories are the primary implementing agencies for UST cleanup regulations; EPA implements the program in Indian Country. State requirements vary, and some tanks or releases fall outside federal UST regulations. Ask the relevant agency how the actual tank and release are regulated.

Compare the records with the proposed solar work

Ask the buyer for a preliminary drawing showing panels and foundations, inverter pads, trenching, access, grading and staging. Have a qualified environmental professional compare it with known tank and piping locations, sampling areas, monitoring wells and any mapped restrictions. Mark uncertain locations and information gaps; the drawing is a screening aid, not a determination that work is safe or approved.

Ask the agency and the professional whether the proposed work could affect monitoring or any conditions in the actual case, and what further information or approvals are needed. A buyer may also request its own environmental diligence; agree on access and handling of intrusive work before it begins.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Address diligence in the purchase option

Before signing, ask who will obtain records, pay for studies, communicate with the agency and manage any newly discovered issue. Review the proposed investigation period, access and restoration terms, deadlines, termination rights and allocation of cleanup responsibility with your attorney. Avoid assuming that an option shifts existing obligations.

Sunland welcomes land and existing project inquiries nationwide. Share the location, approximate acreage if known, your relationship to the property and the fact that a tank was removed. Provide environmental records privately if requested for review.

Questions landowners ask

Does removing a tank close a release case?

Not necessarily. Obtain the tank closure and assessment records and ask the implementing agency for the status and decision on any separate release case.

Can solar equipment be placed near a former tank?

That depends on the location, available evidence, any applicable conditions and the proposed work. Ask an environmental professional and the implementing agency to review the specific layout.

Who should I contact?

Start with the state or territorial UST program. EPA implements the program in Indian Country. Ask the agency to identify the office responsible for the particular case.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.