Find out what is already promised
Collect the current lease, amendments and any written access or crop arrangements. Note the premises, end date, renewal and notice provisions, permitted uses and who may enter. Oral arrangements may matter too; ask local counsel how the applicable rules affect them.
The Department of Energy says whether ground-mounted solar is allowed on leased farmland depends on the lease terms. Do not promise a developer possession or access before checking the rights already granted.

Map the farm operation, not just the field
With the tenant, mark crops, entrances, equipment turning space, irrigation, drainage, fences, livestock routes and areas used seasonally. Ask the project proponent to show proposed construction access, staging, cables and fencing, including work outside the panel area.
Compare the schedule with planting and harvest. Discuss notice for surveys, gates and safe access, who documents existing conditions, and who pays for crop loss, damaged drainage or interrupted operations. Put agreed responsibilities and a process for resolving damage in the documents.
Test any proposed shared use
Agrivoltaics can include crops, grazing or habitat among or beneath panels, but a compatible design and an operator are needed. Ask who controls grazing, vegetation management and equipment access, how water and fencing work, and whether the economics and insurance make sense for the farmer.
NRCS recommends coordinating maintenance and access plans with the farmer or rancher. Do not assume a general promise of continued agriculture guarantees the same acres or operation.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPlan the transition and the end
Ask when the tenant must vacate each area, what notice and compensation apply, and what happens if construction is delayed or canceled. For a solar lease, discuss soil protection, drainage repair, removal, restoration standards and financial assurance with your advisers. NRCS recommends planning for decommissioning and clear responsibilities in the lease.
Prepare for a property review
Share the approximate acreage, county, state, current farm use and any area you would retain. Explain the tenant's existing use and timing constraints. Sunland reviews submissions directly and may follow up; Sunland may contract for a property and assign the agreement to a specialist. An inquiry does not commit you or guarantee a project.
Questions landowners ask
Can a tenant keep farming during a solar project?
Possibly, but it depends on the existing lease, project design and agreed operating arrangements. Identify the actual acres and activities permitted.
Does an inquiry terminate the farm lease?
No. An inquiry is not a substitute for reviewing the lease or complying with applicable notice and consent requirements.
Can storage be included?
A proposal may include storage, which can require its own footprint and access. Ask to see it on the plan.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.