Landowner guide

What should an FSA direct-loan borrower check before a solar lease?

If your farm has an FSA direct loan secured by real estate, check whether the proposed solar lease would cover any of that security before committing to it. Gather the loan documents and a field map, identify the acres affected, and discuss the proposal with your FSA loan official early.

The short answer

Compare the legal description of the FSA real estate security with the proposed solar footprint and current agricultural use. Under 7 CFR 765.252(a), a borrower must request prior approval to lease the surface of real estate security. Provide the draft lease and related agreements, maps and acreage information to FSA, and ask for its review before entering the lease.

Identify the collateral and affected acres

Find the direct-loan documents, security instrument and legal descriptions. Ask your FSA loan official to help identify which real estate secures the loan. Obtain the developer’s proposed option and lease, including exhibits showing the leased area, panels, roads, fencing, trenches, staging and other areas where farming may be restricted.

Compare these drawings with a field map and records of current agricultural use. Show productive and non-productive areas separately, estimate how much FSA security would leave agricultural production, and note areas where the effect is uncertain. A parcel acreage figure or a panel map alone may not show the full effect of fencing and access. Ask the developer to clarify the proposed restrictions and update the map as the layout changes.

Illustration of a land parcel and surrounding landscape

Request FSA review before leasing

Section 765.252(a) requires a borrower to request prior approval to lease the surface of real estate security. Among the conditions for approval, the lease must not adversely affect the Agency’s security interest, contain an option to purchase, or hinder the future operation or success of the farm; the rule specifies requirements if the borrower has ceased operating the farm. The lease and related contracts or agreements must be reviewed and approved by the Agency.

The rule says leases for nonfarm enterprises such as solar farms that take significant acreage of the Agency’s security out of agricultural production are not authorized. It says non-productive land may be considered for this type of lease. The regulation does not set a numeric threshold for significant acreage. Do not assume a proposed layout qualifies: ask FSA to evaluate the actual collateral, use and documents.

Prepare a useful request

Give the FSA loan official the proposed lease and related option, exhibits and agreements, the collateral description, field-use records, affected acreage estimates, anticipated construction and operating restrictions, and a description of the remaining farm operation. Ask what else is needed, how any changes to the draft should be submitted, and whether the proposal can meet the applicable conditions.

Plan for FSA review before signing a lease. Ask the developer and your attorney how the option and proposed lease accommodate review, revisions and a possible denial. Obtain FSA’s decision and any conditions in writing, and make sure the documents submitted for review match the final proposal.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Check other obligations separately

This guide addresses FSA direct-loan real estate security. Do not assume the same rule applies to a privately held loan or an FSA-guaranteed loan: review those loan documents and ask the lender about its own requirements. Other liens, land-use agreements or farm program obligations may also need separate review.

An attorney familiar with farm loans can help review the proposed documents and coordinate timing with FSA and other lenders. Sunland welcomes land and existing project inquiries nationwide. Share the location, approximate acreage and your relationship to the property; provide financial and loan documents privately if requested.

Questions landowners ask

Can I lease FSA loan collateral for solar?

A borrower must request prior approval to lease the surface of real estate security. The proposal must meet the conditions in 7 CFR 765.252(a); a solar lease that takes significant acreage of Agency security out of agricultural production is not authorized. Ask FSA to review the specific proposal.

How many acres count as significant?

Section 765.252(a) does not specify a numeric threshold. Identify the affected security and its agricultural use, and ask FSA for a determination on the proposed lease.

Does this rule automatically apply to my bank loan?

This guide concerns FSA direct-loan security. A private or FSA-guaranteed lender may have its own requirements; consult the loan documents and lender.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.