Draw your own starting boundary
Mark the area you would consider and the home, fields, buildings, woodland or future uses you want to retain. Include field entrances, drainage, water lines, existing easements and shared facilities. Your sketch starts a conversation; a survey or legal description may be needed to define the final area.
A DOE solar scoping resource distinguishes the panel area from the larger site that can include setbacks and fencing. Ask the proponent to identify the project footprint, roads, equipment, construction staging and cable or connection routes separately.

Follow the access and utility routes
A project on one corner may need vehicle access or utility rights across another. Ask where each route begins and ends, its width, allowed uses, construction and maintenance responsibilities, and whether it is exclusive. Check whether the retained land still has practical access for equipment, emergency vehicles and future users.
Show the proposal to the people who use the land. Test whether fencing or grading would isolate a field, interfere with drainage, or make an entrance unsafe. Do not assume the fenced area is the full area affected.
Compare the actual sale and lease
For a partial sale, ask about survey and subdivision approval, closing conditions, purchase price, costs and any easements reserved or granted. For a lease, compare the defined premises, option period, payment acreage, escalation, extensions, assignment and removal terms.
Acreage used to calculate payment may differ from the area affected by construction or easements. Ask how temporary and permanent impacts are compensated, and what happens if the final layout is smaller or the project does not proceed.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCheck constraints on the remainder
Have your attorney review title, existing easements, mortgages, leases and any required consents. Ask local planning officials about applicable subdivision, access and land-use requirements. An independent tax adviser can explain consequences for the proposed transaction and retained property; results depend on the facts.
Share a practical starting point
Provide a location, approximate available acreage and a sketch if available, plus the uses and access you need to retain. Sunland reviews submissions directly and may follow up; Sunland may contract for a property and assign the agreement to a specialist. A submission is not a commitment or guarantee of an offer.
Questions landowners ask
Must I offer the whole parcel?
No. Identify the portion you would consider and the access and uses you need to retain; the proposed project may require other rights.
Is the panel footprint the same as the leased area?
Not necessarily. Ask for a plan that distinguishes panels, equipment, setbacks, access and utility corridors, and compare it with the agreement.
Does a partial sale require a subdivision?
Requirements vary by location and transaction. Confirm them with the local authority and your attorney.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.