Confirm the estate and the notice
Obtain the original patent and later deeds, reservations and title documents. Under an SRHA patent the surface is privately owned while the United States retains the mineral estate and associated rights. BLM recommends checking the patent and its master title plat because other homestead laws reserved different interests. The surface owner cannot sell the federally reserved minerals as part of a private solar deal.
This guide concerns the SRHA Notice of Intent to Locate, or NOITL, for locatable-mineral claims. It does not describe the separate regimes for oil and gas, geothermal resources or saleable mineral materials. Ask the responsible BLM office and mining counsel to confirm the patent, mineral status and actual document before applying these timelines. Federal mineral ownership alone does not establish that a federal solar right-of-way is required for the private surface; a separate federal crossing may need its own authorization.

Record the two notice dates
Preserve the envelope, return receipt and date the surface owner was served. The notice identifies the filer, the area and access routes, proposed mineral activities and dates. Ask BLM for its case number, the complete notice and the date it received the completed filing. Map the described area and routes against the proposed panels, fence, roads, cables and construction staging; include the retained land and existing farm access.
The locator must wait 30 days after service before entering to explore or locate a claim. Separately, the 90-day segregation period begins when BLM receives a complete NOITL; the notice generally expires after 90 days unless a qualifying plan of operations is submitted within that period. A timely plan extends the effects of the period until BLM approves or denies it. Ask BLM to confirm the dates and current status rather than counting both clocks from the letter’s date.
Distinguish limited exploration from operations
During the specified NOITL period and after the service wait, the regulations allow the named locator or agents to enter for exploration and claim location with only minimal disturbance. They prohibit mechanized earthmoving equipment, explosives and toxic or hazardous materials, and prohibit constructing roads or drill pads under that limited activity. A notice is not itself permission for unrestricted construction or proof a claim has been validly established.
The 90-day segregation restricts competing mineral notices, exploration or claim location and certain applications to acquire federal interests. It is not a blanket ban on all private solar sales or leases. Actual surface conflicts and rights are site-specific. Ask BLM to identify current filings and the applicable financial guarantee, and document existing crops, improvements and access before activity begins. Do not assume an absence of visible equipment means the notice has expired.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landReview a requested surface consent carefully
A locator may ask the surface owner to sign a written consent for later operations. Under 43 CFR 3809.31(d), SRHA operations without written surface-owner consent require a plan of operations and BLM approval; where the operator has consent, that subpart does not require a notice or plan of operations. Consent does not automatically waive every other legal requirement, financial guarantee or responsibility for damage. Ask BLM and mining counsel what applies to the proposed work.
Before signing, compare the proposed operations and routes with the solar project’s exclusive areas, construction timetable, access and long-term equipment. Have counsel review the scope, duration, notice, restoration, compensation and successors, and identify who can grant the requested rights. Withholding consent does not give the owner a universal veto: an operator may seek BLM authorization under the applicable plan process.
Use the plan review and protect existing uses
For the statutory authorization route, 43 U.S.C. 299 provides for an operations plan and bond. The surface owner receives a copy of the proposed plan at least 45 days before a decision and has an opportunity to comment. This is different from the 30-day wait after NOITL service. Review the location, work, access and reclamation with counsel, and give BLM specific information about existing structures, crops, operations and conflicts with the proposed solar layout.
Ask BLM to explain the applicable guarantee, reclamation and surface-compensation provisions for the actual proposal. Do not assume the bond amount is adequate for every possible loss or that prospective solar rent will be compensated. Agency review can take longer than the statutory review period when other legal requirements apply; neither the notice nor a proposed plan promises an approval date.
Carry the record into a sale or lease
If the surface changes hands after the notice, 43 CFR 3838.16 says the locator need not serve the new owner again merely because of the conveyance. Give the buyer or lessee the notice, service evidence, BLM case information, any consent or plan, correspondence and current maps. Ask the prior owner for earlier notices as well. A purchaser should not rely on receiving a new letter to identify the issue.
With counsel, address disclosure, access, coexistence, layout changes, restoration, review costs, possession and what happens if a mineral plan conflicts with the project. Sunland welcomes solar land sale, lease and existing project or agreement inquiries nationwide. Share location, acreage and the known notice or mineral issue; supply detailed records privately. Sunland may contract for a property and then assign the agreement to a specialist developer, subject to its terms. An assignment does not erase reserved minerals or existing rights.
Questions landowners ask
Does the notice establish a valid mining claim?
No. It starts the prescribed notice process; ask BLM and qualified counsel to review the filing, later claim records and any validity determination.
Can the surface owner prevent all mineral operations by refusing consent?
No. Without written consent, the operator must submit a plan and obtain BLM approval under 43 CFR 3809.31(d). The statutory process gives the surface owner an opportunity to comment.
Will a buyer receive a new notice after the land is sold?
Not merely because of the sale. The locator need not re-serve a new surface owner under 43 CFR 3838.16, so transfer the existing notice and case records with the property documents.
Sources & further reading
Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.