Identify the award and the proposed change
Find the executed Financial Assistance Agreement, award and obligation notices, signed Form RD 1940-1 if available, letter of conditions, amendments, payment and closeout records, project description, equipment list and installation date. Record the recipient’s legal name, award date, award number, grant amount, funding sources, system location and the useful life and continuing duties in the agreement. A fully paid or closed grant does not by itself establish that every continuing obligation has ended.
Draw the proposed sale or lease boundary around the system, building, meters, utility equipment, access and any retained land. Identify the landowner, recipient, equipment owner, operator, electricity user, proposed buyer or tenant and any lender. They may be different parties. A sale of land with equipment, equipment retained by a seller, a lease that changes site control, and a sale of the recipient entity can raise different questions. Describe the actual structure to RD and counsel.

Check the award vintage and transfer rules
The July 2025 RD Instruction 4280-B described a process under former 7 CFR 4280.124(c): after execution of the agreement, a grantee could request a transfer in writing, subject to written agency approval, eligibility of the new entity, unchanged technology and project scope, and an addendum. That historical process is not a promise of approval and should not be assumed to govern a particular award today.
The October 2026 final rule replaced the prior framework and states in section 4280.162 that obligations cannot be transferred to another entity. Section 4280.153 states that it applies to awards made before or after October 1, 2026, and that applications with Form RD 1940-1 signed by both applicant and agency before the rule’s effective date continue processing if the project remains in line with applicable terms and conditions. That processing provision is not a blanket authorization to transfer an existing agreement. The rule and current fact sheet address a changed program framework; do not assume their new-application conditions automatically rewrite an earlier executed award. Give RD the actual award documents and dates and ask which regulation, terms and transition provisions apply, whether any agreement transfer is available, and what written decision or documentation is needed. If no transfer is available, ask what alternatives and consequences apply before structuring the deal.
Separate the agreement from the property
Transferring a deed or selling equipment is separate from transferring a Financial Assistance Agreement. Ask RD whether the proposed sale, removal, replacement or change in use is a disposition of federally assisted property and which award-specific federal property rules apply. The earlier instruction directs grantees to applicable departmental disposition requirements. Depending on the facts and governing terms, agency instructions, valuation, accounting for the federal interest or repayment may be relevant; do not assume a fixed amount or that any payment automatically releases obligations.
If the seller intends to keep the system on sold or leased land, map and document the rights needed to own, operate, maintain, access and eventually remove it for the applicable period. If the buyer or tenant will control the site or use the electricity, explain that arrangement to RD. Ask whether it is consistent with the award, site control and operational requirements and what changes, notice or consent are needed. A private easement or operating contract does not itself resolve the federal question.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAssemble an owner’s working file
Collect the deed, survey, existing leases and easements; system invoices, serial numbers, warranties, maintenance records and production data; interconnection, net-metering and power purchase agreements; insurance; financing documents, liens and lender consents; tax credit and other incentive documents; and RD reports, correspondence and inspection records. Compare the installed system with the approved project and identify uncompleted work, outstanding reporting or unresolved agency findings.
Ask RD’s state energy coordinator for the award file and a written response to a dated description of the transaction, proposed parties and timeline. Specifically ask about useful life, ownership and control, reports, permitted changes, disposition, any federal interest, required approvals and the consequences of a proposed transaction. Ask the utility and lender separately about their own consent and account requirements. Protect sensitive business and personal information when sharing the file.
Build the answer into the transaction
Have counsel make the agreement reflect the actual RD response, including any required consent or other conditions before closing or possession. Specify who owns the equipment, controls and maintains it, receives its output, pays operating costs and reports to RD. Address access, insurance, liens, utility account changes and the allocation of any approved disposition costs or repayment, along with a practical option if required approvals are denied or delayed.
A lease may leave the grantee and system in place but still change access or control; a sale can separate the award recipient from land and equipment. Review amendments, assignment and later changes as well as the initial deal. At handover reconcile the final documents, site plan and parties with RD’s decision, deliver necessary operating records and calendar remaining reporting and maintenance obligations. Private allocations do not release the recipient from duties owed to USDA.
Discuss the opportunity with Sunland
Sunland considers solar land opportunities nationwide, including potential sales and leases. Share the location, acreage, existing system, ownership, known award and access constraints, and intended timing. Obtain appropriate permission before sharing another party’s records.
Ask what land and rights the proposal needs and how the existing system would be accommodated. Sunland may put a parcel under contract and subsequently assign that contract to a specialist developer. That transaction contract is separate from the existing REAP agreement. An inquiry does not establish grant eligibility, agency consent or a completed transaction.
Questions landowners ask
Does a deed transfer the REAP agreement?
No. A property conveyance and an award agreement are distinct. Ask RD which award-specific rules and terms govern the proposed transaction.
Can the buyer take over the grant obligations?
Do not assume so. The 2025 instruction described a conditional process; the 2026 rule states obligations cannot be transferred. Ask RD which provisions apply to the actual award and transaction.
Does grant closeout end every obligation?
Not necessarily. Review the agreement’s useful life, reporting and property provisions and ask RD to confirm any continuing requirements.
Can I lease land while keeping the existing system?
Possibly, depending on the award and proposed rights. Have RD review site control, access, operation and any required consent before committing to the arrangement.
Sources & further reading
USDA’s October 1, 2026 final REAP rule became effective October 16, 2026. The earlier July 2025 RD instruction describes a conditional agreement-transfer process; the 2026 rule states that obligations may not be transferred. Ask RD which provisions and award terms govern the particular existing award and proposed action rather than assuming either rule applies retroactively. Local rules and program details can change. Check the requirements for the actual project.