Gather the records for the actual application
Ask the grower or tenant and certified applicator for the product name, EPA registration number and label applicable to the product used, the application date and actual start and finish times, the treated block boundaries and the buffer location and period. Obtain the applicator’s name and current contact information, copies of notices and signs, and the relevant access and timing details from the site-specific fumigant management plan and any post-application summary. Ask whether tarps, tarp cutting or removal, or other subsequent work affect entry. EPA describes site-specific management plans, but the applicable label and circumstances determine the requirements for the particular application.
Mark uncertain boundaries or times as unconfirmed. If a neighboring field was treated, ask its operator or applicator whether the buffer extends onto the parcel or a road the survey crew intends to use. A tenant’s crop schedule and future application dates matter too: record who will notify whom if treatment or access plans change. Keep the records with the date received and the name of the person who provided them.

Compare every part of the visit with the map
Ask the developer or testing contractor for a dated work plan showing entrances, travel routes, parking and staging, survey stops, wells or utility crossings, proposed boring and test-pit locations, and the expected time at each. Overlay it on the treated block and buffer map. A surveyor who stops to set equipment, a driller who parks, and a crew digging a pit need access at those specific locations; a route that merely crosses a buffer does not establish permission for stationary work there.
EPA says people should stay out of a posted buffer even when they see workers there, while vehicle and bicycle transit through a buffer can be allowed. Do not infer from this transit exception that a crew can stop, walk, sample or work in the buffer. Treat the treated area and its entry restrictions separately from the surrounding buffer. Check the actual product label and applicable state and local requirements with the applicator; do not assume a survey or testing crew is authorized as pesticide handlers.
Resolve timing before dispatch
Send the marked-up work plan to the certified applicator and ask: What are the actual treated-area and buffer boundaries? When did each applicable restriction begin, and when does it end for these proposed locations and activities? Are there additional restrictions tied to tarps or the planned ground disturbance? Does the neighboring treatment affect the proposed entrance? What label or other requirement supports the answer? Ask for a written response and an updated map if anything changes.
Confirm the plan with the tenant and the developer’s field lead before dispatch. If records conflict, a sign remains posted, or the applicator cannot confirm the relevant access conditions, keep crews out of the affected area and use a confirmed alternative or postpone. Contact the state pesticide regulatory agency for help interpreting applicable requirements. A removed buffer sign alone should not be used to infer that a separate treated-area restriction has ended. Do not move signs or disturb tarps to make a route available.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landProtect the schedule and the land agreement
Ask the developer which visits are essential now and whether survey points, borings, pits or routes can be moved to an unaffected area without undermining the study. Agree on who contacts the applicator, informs subcontractors, updates the map and approves a revised date. Ask who pays for a canceled mobilization, restores test pits and tracks results. Keep the tenant informed so farming operations and future fumigation are coordinated with access.
Before signing an access, sale or lease agreement, have counsel review entry rights, notice, tenant consent or coordination, testing scope, restoration, insurance, confidentiality and extensions when agricultural restrictions delay work. If an agreement already exists, check its notice and scheduling provisions rather than assuming a delay automatically extends a deadline. Recent fumigation is an immediate access and scheduling question; it does not by itself establish a historic chemical release or determine whether land satisfies organic certification requirements.
Owners or authorized representatives in any U.S. state can ask Sunland to screen land for a solar sale or lease, or submit an existing project or agreement for review. Share the location, acreage, proposed work and application information privately. Sunland may contract for a project and then assign it to a specialist; screening does not approve field entry or guarantee a transaction.
Questions landowners ask
Is a field automatically safe for solar testing after 48 hours?
No. The applicable label, actual application, activity and any state or local requirements determine the restrictions. Confirm both treated-area and buffer conditions with the certified applicator before entry.
Can a survey crew stop in a buffer if vehicles may drive through?
Transit permission does not establish permission to park, walk, set equipment or sample. Compare the proposed activity and location with the applicable restrictions.
What if the tenant or applicator cannot provide the application details?
Keep the affected work on hold, request the label, map, timing and relevant plan details, and contact the state pesticide regulator if the restrictions remain unclear. Use an unaffected location only after its access is confirmed.
Does recent fumigation mean the land is contaminated?
Recent lawful fumigation raises an immediate entry and scheduling question. It does not by itself establish a historical release or resolve any separate environmental investigation.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.