Separate registration from cleanup assistance
DCERP regulates active drycleaners and also offers a voluntary environmental response program for eligible solvent-contaminated sites. TDEC explains that registration to operate a drycleaner does not itself mean the facility is registered for assistance with cleanup costs. A former operator’s registration certificate, a site list entry or an application alone is not proof that a particular person or proposed expense is approved for funding.
TDEC announced its Fund Eligibility Policy on January 5, 2026; the policy took effect January 1. Tennessee Public Chapter 970 changed the drycleaner law effective July 1, 2026; TDEC identifies changes involving eligibility restrictions, registration, solvent purchases and a maximum annual per-site cleanup cost limit. Its program page says implementing rules are being developed. The policy is nonbinding and addresses factors including compliance history; prior operations may affect eligibility even after ownership changes. Ask TDEC for the current policy and rules and how they apply to this site and proposed transaction; do not price the deal on an assumed reimbursement amount or schedule.

Check the 2026 eligibility gate
For a new petition concerning a recently abandoned drycleaning facility, the 2026 law defines recently abandoned as closed in accordance with the commissioner’s rules no more than 180 days before submission of the petition. The owner or operator must register before or at the same time as the petition for it to be accepted. Collect the closure and petition dates, closure records, registration and acceptance documents; ask DCERP to determine the applicable category and requirements. A long-closed site should not assume a new petition qualifies merely because a drycleaner once operated there.
The legislation removed the impacted third-party category, which had included certain lessors and owners of affected neighboring property. A landlord or neighboring owner should ask DCERP how its own status and any existing accepted petition are affected. An already accepted site and a new petition require separate analysis: request the acceptance and subsequent registration records, and ask TDEC how the current law applies to the actual participant and remaining work. Do not assume a prior acceptance resolves a new owner’s eligibility.
Build an owner’s record before negotiating
Obtain the facility and parcel history, site identifier, deeds and leases, assessment and sampling reports, maps of affected soil and groundwater, monitoring well locations, correspondence, notices, restrictions and any response completion documents. Request the DCERP file through TDEC and compare it with the owner’s records. Identify the actual applicant or participant, the property and release covered, the current status, any conditions, registration and payment history, and approved contractor.
Ask TDEC in writing what work has been authorized, what remains, whether the participant remains eligible, what deductible or other unpaid obligations apply, and whether the proposed owner, transaction and remaining work can qualify under current law and policy. Request copies of approvals and any available cost and reimbursement records. Funding depends on program requirements and approval; neither a site’s history nor a past payment guarantees future assistance.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAddress a sale or lease before relying on funding
Do not assume that a seller’s participation, approvals or expected fund assistance pass to a buyer at closing. Ask TDEC what notice, application, consent or other steps, if any, are required for the actual parties and transaction, and whether the existing participant will remain responsible for any work. Obtain the agency’s response and have counsel incorporate the result into the agreement. A lease also needs review: determine who remains the participant and who can authorize and access cleanup work.
A purchase or lease agreement can allocate investigation costs, deductibles, uncovered cleanup, delays, access, insurance and responsibility for unexpected conditions. Have counsel address a practical path if TDEC does not approve the expected arrangement or work. Private allocations do not by themselves change agency requirements or release anyone from obligations to the state.
Coordinate the battery layout with cleanup
Overlay equipment pads, transformers, fencing, grading, trenches, utility routes, roads and staging on the environmental maps, including areas outside the battery enclosure. Review access for sampling, wells, treatment equipment and emergency vehicles with the environmental professional, TDEC and the project team. Ask whether the layout or construction sequence conflicts with investigation, cleanup or any site-specific restrictions.
Arrange a soil and groundwater management plan before excavation, including procedures for unexpected contamination and disposal. Stop affected work and seek professional and agency direction if unexpected conditions arise. Do not move or abandon monitoring wells without appropriate authorization. A change in use can also warrant evaluation of vapor intrusion and worker exposure; a battery layout is not itself an environmental clearance.
Confirm authorization and remaining obligations
TDEC’s cleanup guidance describes selecting a Drycleaner Approved Contractor and obtaining program authorization for work; it states that unapproved work is not eligible for fund coverage. Confirm current requirements, approved scope, cost limits and any exceptions with DCERP before commissioning work or assuming a cost is reimbursable. The construction contractor and the approved cleanup contractor may have different roles.
If the file includes a Response Complete Summary, obtain it and review any continuing requirements and recorded restrictions with counsel; completion of a program response should not be treated as proof that every use or excavation is unrestricted. For an open site, set a process for access, scheduling, notice and repair during construction and operation. Keep the final site plan and agency correspondence with the transaction records.
Discuss the opportunity with Sunland
Sunland considers land sale, lease and existing project inquiries across the United States. Provide the location, acreage, ownership or authority to act, site history and known cleanup status. Share environmental reports and agency correspondence privately when requested. Sunland may place a parcel under contract and subsequently assign that contract to a specialist developer; a site inquiry is not a commitment to purchase, lease or fund cleanup.
Questions landowners ask
Does a drycleaner registration mean cleanup is funded?
No. TDEC distinguishes operating registration from the voluntary environmental response program. Verify the participant, eligibility, approved scope and available assistance directly with DCERP.
Does a buyer automatically receive the seller’s fund assistance?
Do not assume it does. Ask DCERP how the actual acquisition affects eligibility, the participant and remaining work, and obtain the answer before relying on assistance in the transaction.
Can battery construction proceed while cleanup continues?
That depends on site conditions, required approvals and the proposed work. Review a complete layout and construction plan with TDEC and qualified professionals, and preserve access to cleanup and monitoring infrastructure.
Is every cleanup cost reimbursed?
No guarantee applies. TDEC describes authorization and eligible-cost requirements, and the law changed in 2026. Confirm the current policy, deductible, limits and approved scope for the specific site with the program.
Sources & further reading
TDEC program guidance and the legislative record for SB 1884 (Public Chapter 970) checked November 17, 2026. TDEC announced a new fund eligibility policy on January 5, 2026 and says rules incorporating statutory changes effective July 1, 2026 are being developed. Confirm current rules and site-specific decisions with TDEC. Local rules and program details can change. Check the requirements for the actual project.