Find the express right and read its limits
The signed June 2024 Carrollton printing facility lease between Texas Dugan Limited Partnership and The Dallas Morning News, Inc. gives the landlord the right to place energy installations on the building or project. Section 36(m) lists solar systems, battery storage and electric vehicle charging among the examples. It also lets the landlord lease to a third party for installation and operation. The installation must avoid unreasonable adverse impacts on the tenant’s use of its premises and any additional costs to the tenant.
Use the example to look for corresponding language in your own lease. Check the defined building, project and premises, including space over or outside the tenant’s suite. Also read provisions on access, quiet enjoyment, utilities, operating expenses and amendments. Ask counsel whether the rights you plan to give the battery company fit all of those terms.

Test the proposed grant against the tenant’s use
Ask for one drawing showing the permanent equipment, cable routes and access rights, along with temporary work, deliveries and tie-in outages. Compare it with the signed lease exhibits and the tenant’s actual operations. For example, a battery pad outside the tenant’s suite may require a staged shutdown or a new truck route through space the tenant uses.
Ask the developer to state expected outage windows and how it will maintain loading, parking and emergency access. If the layout relies on access, utility work or downtime the landlord cannot promise under the existing lease, revise the plan or have counsel obtain the required written agreement. Put the agreed layout and work limits into the battery lease.
Show who pays before you approve the deal
Identify each meter, account and billing path. Ask who pays for testing and charging electricity, connection work, and any additional costs tied to common areas or building systems. Review whether any project cost could flow through the tenant’s utility bill, operating-expense statement or another invoice. A separate project meter can address some billing questions. Check shared charges separately.
Have counsel and property management document the agreed allocation in the battery lease and billing instructions. Name the party that will review the first bills and correct any charge allocated to the tenant contrary to its lease. If you cannot establish that the proposal meets the tenant-use and cost limits, make the change before authorizing the developer to start.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDiscuss the proposed battery lease
Sunland reviews battery storage land sales, leases and existing project agreement inquiries across the United States, including potential assignments. Share the site location, approximate acreage, your role and the area the developer wants to use. Keep leases, meter records and detailed drawings available for private review.
Questions landowners ask
Does a right to install a battery let me lease the site to a developer?
Check the wording for a separate right to grant installation and operating rights to a third party. The Carrollton clause expressly addresses both routes.
What if the developer’s battery is outside the tenant’s suite?
Review the routes, outages and expenses that can still affect the tenant. Compare the work and billing plan with the actual lease before signing.
Will a separate meter prevent every new charge to the tenant?
Review common-area and shared-system expenses as well as electricity billing. Make the developer’s costs and the billing responsibility clear in the proposed documents.