Identify the system and its users
Obtain the PWS ID, current TCEQ status and owner record, operator and contact information, and a list of the tenants and other users and connections served. Ask who owns the well or other source, treatment and storage equipment, meters, pumps, distribution lines, controls and land under them. Collect deeds, bills of sale, equipment inventories, plans, as-built drawings, service agreements, operating and maintenance records, sampling and compliance correspondence, and any outstanding notices or required improvements.
Confirm the facts with the current owner and operator and TCEQ records. A property owner, water-system asset owner, TCEQ-recorded owner, operator, lessee and administrative contact can be different parties. TCEQ says an administrative contact is not a lessee or operator. Changing a contact or giving a battery developer access to land does not itself transfer water-system ownership or operating responsibility.

Map the battery work around water service
Request a scaled site plan showing the battery enclosure, roads, cables, drainage, grading, fencing and temporary staging. Overlay the source, treatment, tanks, buried and overhead lines, connections, power supply and routes needed for sampling, repairs and emergency access. Locate assets in the field and compare the drawing with recorded easements, deeds and existing service or access agreements; a line may serve users outside the proposed project parcel.
If the owner retains the system or carves it out of a sale, have the parties define the land and assets retained and durable rights for access, utilities, inspection, maintenance, replacement and emergency work. Address gates, construction protection, outages, restoration and costs. If equipment or lines must move, ask TCEQ about engineering review and approvals before work begins. Its plan review guidance addresses public water system engineering and significant changes; do not assume a private site plan is enough.
Compare retention, conveyance and inactivation
For retention, identify the continuing owner and licensed operating arrangements, funding and access, and how users on both sides of the new boundary will be served. A lease of part of the tract may leave the water system with its existing owner, but the lease must allow that owner and operator to meet their obligations. Have counsel check existing leases, lender interests and water service agreements before settling the boundaries.
For a conveyance, document exactly which assets, land and rights transfer and who will operate, maintain and pay for the system after closing. TCEQ’s ownership-update guidance requests a Core Data Form and a deed or bill of sale for an ownership change. Ask TCEQ what supporting information and sequence apply to this transaction. The PUC certificate of convenience and necessity (CCN), if applicable, is a separate question from ownership of physical assets and the TCEQ owner record. If a PUC sale, transfer or merger approval is required, TCEQ directs utility ownership updates after that approval. Check the actual CCN and proposed transaction with the PUC and counsel; do not assume every PWS has the same utility status.
For inactivation, first determine whether the system can actually cease serving users and what lawful replacement service or other arrangements are needed. If the system no longer meets the public water system definition, provide TCEQ the supporting documentation it requests. TCEQ reviews the information and confirms the status with its regional office before sending an official inactivation or consolidation letter. Continue to operate the system and comply with applicable requirements until that letter arrives. An owner’s desire to stop, an abandoned plan, change of contact, vacant project area or private agreement alone does not establish formal inactivation.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAssign responsibilities before signing
Ask the current owner and operator: Who serves each connection now and after closing? Who owns each asset and pays for testing, operation, repairs and improvements? What notices or compliance items remain open? Ask TCEQ which forms, engineering submissions and inactivation or ownership steps apply, and ask the PUC whether a CCN or transfer approval is involved. Record the answers, responsible parties and dependencies in a transaction checklist with counsel.
The sale or lease should address continued service, access and construction protection, approvals and their sequence, allocation of costs and risk, required records, and what happens if a necessary approval or replacement arrangement is unavailable. Sunland welcomes land sale, lease and existing agreement inquiries nationwide. For a Texas battery storage inquiry, identify the approximate location and the known PWS ID and status. Sunland may contract for a parcel and then assign its interest to a specialist; discuss assignment and water-system obligations before signing. Agency approval and compliance are not guaranteed.
Questions landowners ask
Does a battery land sale automatically transfer the public water system?
No. Identify the assets and rights being conveyed and the parties responsible for service. TCEQ ownership records and any applicable PUC utility approval must be addressed separately.
Can the landowner retain the system?
Potentially. The retained system needs workable land and asset boundaries, access and utility rights, operating arrangements and continued service to its users. Review the proposed carveout and agency requirements with counsel and the operator.
Can an administrative contact act as the new owner or operator?
A contact designation does not itself transfer ownership or establish operating responsibility. TCEQ distinguishes an administrative contact from a lessee or operator.
Can the system simply be turned off when the battery project begins?
Do not assume so. Determine the users’ lawful service arrangements and ongoing obligations first. If the system no longer meets the public water system definition, provide the documentation TCEQ requests and continue operation and applicable compliance until TCEQ sends its official inactivation or consolidation letter.
Is a PUC CCN the same as the TCEQ PWS owner record?
No. They address different matters. Check whether a CCN and PUC approval apply to the proposed transaction as well as what TCEQ requires for its ownership record.
Sources & further reading
Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.