Map the registered yard against the project
Obtain the current registration and application, site plans and survey, lease and amendments, and any access agreements. Identify the registrant, landowner and operator, the land each controls, and the term and termination rights. Compare the documented storage area and routes used by the tire operation with the proposed battery fence, construction staging, driveway and utility corridor. A fence that avoids the tire piles may still block the operator’s access.
TCEQ says a storage site must register, provide financial assurance for closure costs and provide public notice if it stores more than 500 used or scrap tires on the ground or more than 2,000 in enclosed, lockable containers, including weight equivalents or combinations of tire pieces. TCEQ must approve registration before storage begins, and registration is valid for 60 months from issuance. Confirm the site’s actual status, registered boundaries and any proposed changes with the Scrap Tire Program; do not assume registration transfers to a buyer or permits a changed operation.

Read the owner affidavit and access terms
Find the signed property owner affidavit and compare it with the lease, registration dates and proposed project schedule. TCEQ’s property owner affidavit, form 10299, states that the operator or registrant shall have access for five years or until registration expires, whichever is shorter, for operation, maintenance and business. Have counsel review the signed documents and their application to this site before agreeing to exclusive battery project possession or blocking an existing route.
The affidavit also acknowledges that the state may hold the owner and applicant jointly or severally responsible for operation, maintenance, closure and any required post-closure care. It acknowledges the owner’s responsibility upon closure to file an affidavit in county deed records advising that the land was used for waste tire recycling, processing or storage. These are reasons to obtain advice on actual obligations and timing, not assumptions that a particular filing or liability has already been resolved.
Plan removal, records and closure
Ask for current tire counts, manifests, annual activity reports, financial assurance documents, agency correspondence and any closure plan or instructions. TCEQ says manifests track tires brought to or removed from a storage site, and annual reports include quantities, delivery point and end-use. Reconcile records with a current physical inventory and arrange lawful transport and receiving destinations. An annual report or a cleared surface alone does not prove all tires and pieces have been removed.
Ask TCEQ what changes, closure steps, notice, reporting and financial assurance requirements apply to the proposed transition, including whether the yard will continue on a smaller area. TCEQ provides a status update form for a site no longer operating. Confirm the required deed-record affidavit and timing with counsel and the agency; do not treat filing it as a substitute for completing closure or resolving site conditions.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSequence access and possession
With the tenant’s cooperation, consider scheduled survey and environmental investigation access while the yard operates. Engage a qualified environmental professional to review records and inspect for site conditions, with appropriate safety controls and agreed terms for any sampling. Tire removal alone does not establish that the property is ready for construction.
Set milestones for intake, removal and documented disposition, agency steps, verification of the area, and delivery of possession. Allocate responsibility for costs, access, insurance, restoration and delays. If a portion of the yard remains active, document compatible boundaries and routes and confirm the regulatory position before fencing or construction. Counsel can align the land agreement with the tenant’s rights and the actual closure schedule.
Prepare an inquiry
Share the location, approximate acreage, ownership and operator relationship, current use and proposed availability. A sketch showing the tire area and routes alongside the potential battery footprint helps identify conflicts early. Sunland welcomes land sale, lease and existing project inquiries nationwide; a preliminary discussion does not establish project approval or a possession date.
Questions landowners ask
Can the tire operator remain while a battery project is evaluated?
Possibly. Coordinate limited investigation access with the operator and check the lease, registration and safety arrangements. Confirm any proposed change to the facility with TCEQ.
Does removing the visible tire piles finish closure?
Not necessarily. Reconcile inventory and manifests, confirm applicable closure and reporting steps with TCEQ, and review the deed-record affidavit and site conditions with qualified advisers.
Can the owner promise exclusive possession when the lease ends?
Review the lease, signed owner affidavit, registration dates and operator access rights with counsel first. The project footprint and routes must also be consistent with any continuing operation or closure work.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.