How should a family cemetery appear in a Texas solar option?

If land you are considering for a solar option contains a family cemetery, identify it early. Give the developer the records and family knowledge you have, and ask for the cemetery and a practical visitor route to be shown on the option exhibit before signing. Mark uncertain boundaries as uncertain rather than treating a fence or visible markers as the full burial area.

The short answer

On the proposed exhibit, show the known cemetery, its visible features, the route visitors use and any area where burials or boundaries are uncertain. Ask the developer to show proposed fencing, gates, roads and ground disturbance alongside them. Have a Texas attorney review the option, access arrangements and any needed investigation before you agree to a footprint.

Collect the evidence and mark uncertainty

Gather deeds, surveys, cemetery records, old maps, photographs and family accounts. Walk the site with appropriate care and note markers, fences, gates and the route from a public road. A cemetery can include unmarked graves, and the visible fence or markers may not establish its full extent. Identify the source and reliability of each boundary and mark areas of possible burials or unknown limits on the exhibit.

Ask the developer to show the proposed option area and project features, including panels, foundations, fencing, gates, roads, cable trenches, grading and staging, on the same drawing. Keep the known cemetery and areas of uncertainty out of proposed disturbance while the facts and applicable requirements are investigated. A preliminary exhibit is a planning tool, not a determination of the cemetery boundary.

Illustration of a land parcel and surrounding landscape

Plan for reasonable visitor access

Texas Health and Safety Code section 711.041 provides that any person wishing to visit a cemetery or private burial grounds with no public ingress or egress has a right to reasonable ingress and egress for cemetery visits. The surrounding landowners may designate reasonable routes and hours. Outside those hours, access must be allowed at a reasonable time when the visitor gives the surrounding owners written notice at least 14 days before the visit. The section does not apply to an unverified cemetery.

Show the proposed route and gates on the exhibit, and discuss how visitors will find and use them during construction and operation. Address gate operation, contact information, maintenance, construction interruptions and who will coordinate visits. Have counsel review arrangements against the statute and any other applicable rights; an option exhibit alone does not decide those rights.

Protect the cemetery and resolve open questions

The Texas Historical Commission explains that property dedicated for cemetery use generally cannot be used for another purpose unless the dedication is removed by a district court or the cemetery is enjoined or abated as a nuisance. Its guidance also describes restrictions on improvements that would disturb an unknown or abandoned cemetery. Do not assume that a solar lease permits disturbance or that moving graves is a routine solution.

If the limits or presence of graves are unclear, discuss appropriate records research and qualified professional investigation with your attorney and the Texas Historical Commission. If possible remains or a previously unknown cemetery are discovered during work, stop work in the affected area, protect it from disturbance and seek prompt legal and agency guidance. Different notice requirements can apply to unknown, abandoned and unverified cemeteries.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Put the agreed plan into the option

Ask your attorney to review the exhibit and terms addressing the cemetery, excluded or protected areas, access, gates, maintenance, notice, investigation, discoveries and changes to the layout. Decide how uncertainty will be resolved and how the agreement will be updated if the cemetery or visitor route is found to differ from the drawing. Discuss the plan with family members, cemetery representatives and other affected owners where appropriate.

Sunland welcomes land and existing project inquiries nationwide. Share the location, approximate acreage and your relationship to the property, and mention the cemetery and any known access or boundary questions. Share sensitive records privately if requested.

Questions landowners ask

Does a family cemetery prevent a solar project?

Not necessarily. The usable footprint and access arrangements depend on the cemetery, the land, applicable law and the proposed project. Identify and protect the cemetery and obtain site-specific legal advice before agreeing to a layout.

Can a solar fence block cemetery visitors?

Where section 711.041 applies, visitors have a right to reasonable ingress and egress for cemetery visits. Surrounding owners may designate reasonable routes and hours, and the statute provides for visits outside those hours with specified written notice.

Is a cemetery fence the legal boundary?

Not necessarily. Graves may extend beyond visible markers or fencing. Mark uncertain areas and consult counsel and qualified professionals about how to establish the relevant boundaries.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.