Identify the field and the agreement
Ask the biosolids permit holder for the signed landowner agreement and attachments, current permit and amendments, approved field maps, nutrient management plan, field control number and application history. Compare them with the deed, tax parcels and a survey. The parcel offered to a solar developer, the land in the agreement and the permitted application field may have different boundaries. Check for other owners or agreements covering the same field.
Under both the Virginia Pollution Abatement (VPA) and Virginia Pollutant Discharge Elimination System (VPDES) provisions, the required written agreement includes landowner acknowledgments to notify the permittee when land is sold or ownership transferred and when a change invalidates a component of the agreement. It also addresses site restrictions and DEQ inspection access. The permit holder is responsible for obtaining and maintaining the agreements. Read the actual agreement for its additional terms, including notice and termination.

Match the solar drawing to the records
Have the developer and surveyor overlay the permitted field, field control number, setbacks and application areas on a scaled plan showing the proposed sale or lease line, fence, access, cables, grading, temporary work and retained farm land. Ask the permit holder to identify which acres were actually treated and when. A field listed in a permit is not proof that all of it was recently treated, and a solar fence is not necessarily the transaction boundary.
Obtain dates, locations, material class, quantities and applicable site restrictions for recent applications. Ask the permit holder and DEQ which restrictions still apply to the actual site and planned activities. For example, Virginia’s VPA rules require public access to low-exposure land to be restricted for 30 days following an application subject to the Class B site restrictions. Restrictions can depend on the material, application and use; do not assume a sale, lease or termination of consent erases them. Keep the records available to the buyer or tenant and contractors so the work can be planned around applicable restrictions.
Compare selling with leasing a carve-out
For a sale, show the exact land to be conveyed and retained. Give the permit holder the notice required by the agreement when ownership transfers, and discuss the proposed boundary change in advance. Ask the permit holder and DEQ what documentation or permit action is needed for any future application on the retained or conveyed area. A deed alone is not a substitute for the applicable landowner agreement or permit process.
A lease may leave title with the owner, but the solar footprint, access rights and construction can still affect the agreement and approved field. Check the agreement for notice, consent and termination terms, and tell the permit holder if a change makes any component invalid. Ask whether the field or agreement must be revised before further application. Do not assume that a lease automatically transfers consent to the developer or terminates it.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSettle the handoff before work begins
Agree in writing who will notify the permit holder, obtain records, coordinate with DEQ, pay for survey or permit work, and protect any restricted areas. Address existing access and inspection rights, application scheduling, construction limits, restoration and what happens if the field cannot be released or revised in time. Coordinate the terms with the solar option, sale contract or lease and any existing farm tenancy.
Ask the permit holder and the DEQ regional office to confirm the status and next steps for this specific field. Keep copies of notices, responses, revised maps and any resulting permit or agreement documents. Future land application must follow the actual permit and applicable rules; solar site approvals are a separate question.
Discuss the land with a solar developer
Sunland welcomes Virginia solar land inquiries. Share the approximate location, acreage and whether a biosolids agreement or recent application affects the proposed area. Provide the field map and agreement privately when appropriate and ask for a layout that accounts for the records.
Questions landowners ask
Does selling the field automatically end the biosolids agreement?
Do not assume it does. Read the agreement, notify the permit holder of the transfer as required, and ask the permit holder and DEQ how the change affects future application and the field records.
Can a solar lease cover part of a permitted field?
The parties can evaluate a partial footprint, but the lease, actual agreement, field map and applicable permit must be reconciled. Notify the permit holder of changes that invalidate a component of the agreement and confirm any required action before further application.
Do restrictions disappear when application stops?
Not necessarily. Ask the permit holder and DEQ which restrictions apply based on the material, application dates and proposed use, and plan construction accordingly.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.