Stop, protect and report
Ask the supervisor to stop excavation, grading, vehicle traffic and other disturbance in and around the discovery. Do not touch, collect, clean, move or expose more remains or objects. Secure the area from further disturbance without entering it or driving stakes into the ground nearby. Virginia Department of Historic Resources (DHR) guidance says to leave even bones that appear human in place and report the find immediately to local or state police; the site could require a law enforcement investigation.
Tell police where the discovery occurred and what work was underway, and follow their instructions about access and preservation. The medical examiner has a role when a death falls within Virginia’s investigation requirements. Do not decide for yourself that remains are ancient, nonhuman or outside law enforcement’s concern. Notify the developer and your attorney, and ask the supervisor to preserve the relevant work records without disturbing the site.

Coordinate without assuming control of the site
The owner, developer and contractor may have different rights and responsibilities. A solar lease, easement or construction agreement may give the developer possession of only part of the property; a discovery may also lie near a boundary, access corridor or neighboring interest. Check the actual agreement and work map, identify who controls each affected area and make sure the stop and notice reach every crew. Ownership or a lease does not authorize disturbance of a burial.
Ask the project team for one contact, a written record of the affected work and notices, and a plan to protect the area. Limit circulation of precise locations and images to officials and people who need them; do not post photographs or identifying details publicly. Follow official instructions and applicable notice requirements. If police determine the matter is not criminal and the remains appear historic or prehistoric, DHR can assist with treatment and preservation. Ask the local planning or permitting office about project conditions and any changes to the approved layout; it does not replace police, DHR or a court.
Consider avoidance and the applicable legal process
Ask whether a qualified archaeologist, in consultation with DHR and other responsible authorities, can help define an appropriate protection or avoidance plan without unauthorized disturbance. A visible feature or initial discovery does not necessarily show the full extent of a burial ground. Discuss descendants or culturally affiliated communities with DHR and counsel, and follow the applicable consultation process. Changes to fencing, roads, trenches and equipment locations may need review under project approvals and agreements.
Moving remains to another cemetery is a separate legal process. DHR describes circuit court orders for removal and relocation from a cemetery or burial place; for example, section 57-38.1 provides a landowner petition route for a previously unidentified graveyard or an abandoned family graveyard when no body has been interred for 25 years and there is no reservation of rights, or the beneficiaries wish to waive those rights. The statute also sets notice and other requirements, and a court decides whether removal is proper. Separately, section 10.1-2305 generally requires a DHR Director’s permit for archaeological field investigation removing human skeletal remains or associated artifacts from an unmarked burial, whatever the site’s age or ownership. For unmarked burials outside a legally chartered cemetery, permitted archaeological excavation is exempt from sections 57-38.1 and 57-39; the exemption does not apply to burials in formally chartered abandoned cemeteries. A DHR permit is also required when archaeological investigation is part of a court-approved cemetery removal. Ask Virginia counsel and DHR which process and other requirements apply; neither a construction schedule nor a private agreement substitutes for them.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDocument the path forward
Have the developer and counsel identify the affected footprint, responsible parties, agency directions, necessary approvals, costs, schedule changes and any revised protection plan in writing. Obtain confirmation from the responsible authorities about the area and activities that may resume, and satisfy applicable permit and project conditions before authorizing affected work. A decision about one area does not automatically clear another.
Sunland considers land and existing project opportunities nationwide, including sales, leases and assignments. An owner or authorized representative can share the property location, approximate acreage, extent of land control and project status privately. Identify a discovery without sending sensitive images or precise burial locations publicly. Have Virginia counsel review the documents and site-specific obligations.
Questions landowners ask
What if the bones might not be human?
Leave them in place and immediately report bones that appear human to local or state police, as DHR advises. Let the responsible authorities determine the next steps.
Can the solar developer move the remains to keep construction on schedule?
Not on that basis. Legal relocation and archaeological recovery follow distinct processes that depend on the circumstances. Consult police, DHR and Virginia counsel before any proposed disturbance.
Can construction continue elsewhere on the parcel?
Do not assume it can. Ask the responsible authorities and project team which areas and activities may proceed, and comply with their directions and applicable project conditions.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.
- Virginia DHR: Cemetery preservation and discoveries
- Virginia DHR: Human remains and state property guidance
- Virginia Code section 10.1-2305: Archaeological excavation of human remains
- Virginia Code section 57-38.1: Landowner proceedings
- Virginia Code section 18.2-126: Violation of sepulture
- Virginia Code section 32.1-283: Investigation of deaths