Identify the program and the agreements
Ask for the award, executed grant agreement and amendments, site-host agreement, operator and utility agreements, site plans, easements and any recorded interests. Identify who owns the land and charger, who signed the grant, and who operates and maintains the station. The landowner, host, grantee and operator may be different parties; a host cannot assume it can amend another party’s rights alone.
WSDOT’s Electric Vehicle Charging Reliability and Accessibility Accelerator (EVC RAA) funds repair or replacement of eligible existing broken or non-operational publicly accessible chargers, not every grant-funded charger. It is federally funded through a NEVI set-aside. Other programs and individual awards can have different conditions. Confirm the actual program and executed documents with the grantee and WSDOT before applying any program example to the parcel.

Compare the operating term and access rights
WSDOT’s EVC RAA program requires an applicant that does not own the property to obtain a site-host agreement allowing construction and operation for at least five years. Its published request includes a model grant agreement calling for the grantee to operate and maintain stations for five years from WSDOT’s notice to proceed for Task 4. These are different reference points: check the actual host agreement, grant, notices, amendments and dates rather than assuming either period has expired or that both end together.
Determine the host’s promises and the operator’s rights to public parking and access, maintenance entry, power, communications, signs and equipment. Review renewal, termination, relocation, assignment and consent provisions, including rights that bind successors. Ask WSDOT and the grantee which grant conditions apply and what approvals are needed before changing the approved site.
Protect the charger during battery construction
Overlay the battery pad, setbacks, fence, gate, access road, staging, trenching and utility connections on a surveyed charger plan. Include charging spaces, accessible routes, public and service-vehicle access, equipment and buried lines. A battery lease can carve out the charger area and necessary access and utility corridors, while expressly reserving the rights needed for the operator to reach, operate and maintain it. Have counsel and the affected parties define the boundaries and rights; a map alone does not amend existing agreements.
Agree on a construction and outage plan before work starts: notice, safe routes, utility coordination, repair response, restoration, costs and who communicates with drivers. EVC RAA projects must meet applicable NEVI standards, including minimum uptime requirements. WSDOT notes that the standards differ depending on station power level and whether the charger serves users of a designated Alternative Fuel Corridor. Do not assume a planned outage is automatically permitted or excluded from an uptime calculation. The grantee and operator should check the award and applicable requirements and obtain any required approvals before interruption or relocation.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landStructure a sale, lease or assignment around existing rights
For a sale, disclose the grant and host documents to the buyer, confirm which rights run with the land, and make closing subject to required consents and documented successor obligations. A sale does not automatically transfer the grant or release its grantee. For a battery lease, exclude or expressly reserve the charger footprint, access and utilities, and reconcile construction and operational rights with the host agreement. If assigning an existing battery agreement or project, review both agreements for assignment and consent requirements and identify who remains responsible until an approved transfer takes effect.
Ask the charger operator, grantee, WSDOT and counsel as appropriate about proposed changes and written consents. Allocate expenses, damage, interruptions, restoration and remedies if approval is denied. Sunland welcomes nationwide land sale, lease and existing project inquiries, including assignment of an existing battery storage agreement or project. Share the location and proposed battery footprint; provide agreements privately for review.
Questions landowners ask
Does a five-year site-host term mean the charger can be removed after five years?
Not necessarily. Check the executed host and grant agreements, actual start dates, extensions, property rights and required approvals before agreeing to removal or relocation.
Can battery construction temporarily close the charger?
Do not assume it can. Review the host agreement and grant, coordinate with the operator and grantee, and obtain any required approval for an outage and restoration plan.
Does selling the land transfer the grant?
Not automatically. Confirm the grant and host agreement’s transfer provisions, required consents and continuing responsibilities with the parties and WSDOT.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.