Washington landowner guide

Can a warehouse conversion for battery storage take a freight elevator out of service?

A proposed battery storage conversion may change how a Washington warehouse uses its floors, loading areas and freight elevator. Taking the elevator out of service can affect tenants and building access even if the battery equipment will occupy only part of the property.

Could my land work?

First identify who needs the elevator, what the leases require and whether the building official considers it necessary for occupancy or access. Confirm the conveyance status and jurisdiction, then discuss the proposed red tag, decommissioning or removal with the elevator authority, building official and a licensed elevator company. Make any sale, lease or project assignment conditional on the needed rights, approvals and an agreed access plan.

Map the conversion and the people who use the lift

Collect the conveyance number, operating certificate, inspection and maintenance records, building plans, occupancy information and tenant leases. Identify the owner, manager, occupants and any other parties with access rights. Ask tenants how they move inventory and equipment between floors, and whether other routes can actually accommodate their loads and schedules. Review access and accommodation needs with the building official and qualified advisers; a freight elevator label alone does not settle the building’s obligations.

Map the battery equipment, electrical work, ventilation, fire access, construction staging and routes alongside the loading dock, hoistway and tenant circulation. A fenced yard or temporary work zone may restrict access even if the elevator remains operational. Consult the local permitting and fire authorities about the proposed use and any work; elevator status alone does not approve the conversion.

Illustration of a land parcel and surrounding landscape

Distinguish red tag, decommissioning and removal

Washington defines red tag status as a conveyance removed from service because of noncompliance or at the owner’s request. L&I’s owner request form describes an inspector locking a unit for a requested red tag. A red tag is not permission to operate the elevator; discuss corrections and return to service with the authority and elevator company. Required maintenance, examinations and safety tests must be current before removal of the red tag.

Decommissioning is not removal. Under WAC 296-96-01008, a licensed elevator mechanic working for a licensed elevator company decommissions the conveyance according to ASME A17.1/CSA B44. If it is the building’s only elevator, the owner or agent must obtain a local building official’s approval letter. After the work, the mechanic schedules a department inspection; annual inspections cease only upon department inspection and approval, until return to service. Before using it again, confirm the required inspections and operating permits with the authority.

L&I form F621-063-000 offers separate owner-requested red tag, decommission and removal choices. The form calls for the building official’s signature for red tag and decommission, indicating the conveyance is not required for occupancy. It describes removal as complete removal by a licensed elevator company, with an exception when the area or building is taken to studs or demolished. Confirm the particular scope, permits and sign-off with the authority before work; a disconnected or unused lift is not automatically removed.

Confirm the authority and update the records

Check whether L&I or a local jurisdiction handles the conveyance. L&I’s inspection lookup excludes Seattle and Spokane, so check with the local authority there rather than assuming the state lookup is complete. Ask the relevant authority which forms and procedures apply, and obtain written confirmation of the resulting status.

L&I lists F621-063-000 for an owner-requested status change and F621-050-000 for updating contact information. The latter is an information update, not a red tag or decommission request. Its instructions call for submission when contact or information changes, one location per form and actual person contacts. Coordinate a change of owner or manager with the authority and preserve inspection and approval records for the successor.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Allocate rights and costs before committing

The owner should review existing leases, access rights and any lender or other consent requirements with counsel. A tenant or project holder should verify authority before offering rights. A property sale, a battery lease and assignment of an existing battery agreement transfer different interests; none alone establishes that elevator duties, tenant rights or approvals have shifted. Obtain any necessary consents and document who is responsible before and after closing or assignment.

Address tenant notice and continued access, the approved scope and sequence, elevator and building work, inspections, costs, restoration, delays and the outcome if an approval is denied. Sunland considers land sales, leases and existing project or agreement assignments for battery storage. Share the site location, your interest, the proposed footprint and known elevator or tenant issue; provide records privately for review.

Questions landowners ask

Does a red tag decommission a freight elevator?

No. Red tag status removes a conveyance from service; decommissioning is a separate process with licensed work and inspection.

Can the owner decommission the only elevator without the building official?

WAC 296-96-01008 requires the owner or agent to obtain a letter of approval from the local building official when decommissioning the building’s only elevator. L&I’s request form also calls for the official’s signature for owner-requested red tag and decommission.

Does a sale or battery lease eliminate tenant access rights?

Not automatically. Review the leases, building requirements and proposed transaction with counsel, occupants and the relevant authorities before committing.

Sources & further reading

Washington L&I owner forms, elevator rules and information update form checked November 16, 2026. Confirm jurisdiction and current requirements for the specific building and conveyance. Local rules and program details can change. Check the requirements for the actual project.