Identify the funding and who controls the site
Collect the award, grant agreement and amendments, any license, site plan, recorded interests and pumpout operating records. Identify the marina and land owner, grant recipient, equipment owner and operator. If you are a tenant or operator, check what authority the owner and your lease give you before offering a battery developer rights. A sale of land, a lease and an assignment of a development interest may affect different rights; none by itself establishes that the grant obligations have transferred.
Confirm the program with the awarding agency. A Washington State Parks-administered Clean Vessel Act (CVA) grant is federally funded and has its own agreement and conditions. A pumpout agreement under RCW 79A.60.540 has specific statutory terms. Do not assume that all pumpout funding follows the same ownership, fee or duration rules.

Check the applicable pumpout obligations
For contracts under RCW 79A.60.540, the state through the commission retains ownership of the unit at a privately owned marina; a public entity holds ownership at a publicly owned marina. The contract recipient is responsible for operation, normal and expected maintenance and ongoing utilities. The unit must be operating and available for public use during facility operating hours, except necessary maintenance periods.
The recipient grants the commission a no-cost irrevocable license for installation, existence and use for at least ten years. The statute also requires the boating public access during operating hours and prohibits a use fee under those contracts for at least ten years. Review the executed documents and dates; a ten-year minimum does not establish that this particular project’s obligations have ended.
For comparison, the State Parks 2025–26 CVA guide says equipment purchased with CVA grants is owned by the subrecipient and must be maintained for its useful life. It describes public access and allows a fee up to $5 under that program. Check the actual award and any overlapping conditions before relying on either rule.
Test the layout and any proposed change
Ask the developer to show the battery pad, fences, gates, access road, buried lines and temporary work areas alongside the pumpout, pier, water, sewer and electrical connections and boat approach. Consider access for the boating public and maintenance workers during construction as well as operation. Have the agency and qualified professionals evaluate any potential interruption and whether permits or other property rights are affected.
Do not assume a pumpout can be moved or access narrowed simply because the owner and developer agree. Ask the administering agency in writing whether the proposed layout, temporary outage or relocation is acceptable, what approvals and permits are required, and what arrangements must be in place before work begins. The CVA guide requires State Parks review and approval of changes to approved grant work. It also calls for reimbursement if the applicant ceases operating and maintaining the facility as a pumpout or changes its integrity, and written disposition instructions from State Parks for equipment no longer desired or functional. A temporary work plan does not automatically establish that reimbursement is due; review the agreement and ask the agency about the proposed work.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAddress transfer and costs before signing
Ask the agency and your attorney whether the grant agreement permits assignment or transfer, whose consent is required, and whether a successor must assume obligations. Obtain any required written approvals and document who remains responsible until an approved transfer takes effect. Do not assume selling or leasing the parcel releases the recipient or conveys equipment owned by someone else.
The battery agreement should address the approved access and construction plan, maintenance, utilities, relocation and restoration costs, responsibility for damage and interruptions, and what happens if required approval is refused. Sunland welcomes nationwide land sale, lease and existing project inquiries, including assignment of an existing battery storage agreement or project. Share the location, your interest in the property and the proposed battery footprint; provide grant documents privately for review.
Questions landowners ask
Does the marina owner always own the pumpout?
No. For contracts under RCW 79A.60.540, the state retains ownership of the unit at a privately owned marina, while a public entity owns the unit at a publicly owned marina. Other funding programs can differ; check the award.
Can a developer move the pumpout?
Do not assume relocation is permitted. Consult the administering agency and review the grant agreement, required approvals, permits, public access and utility connections before agreeing to a move.
Does a sale or lease transfer the grant?
Not automatically. Review the agreement and ask the agency about consent, assignment and successor obligations. Confirm in writing who remains responsible.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.