Washington landowner guide

Can you protect a Washington irrigation right while land is leased for solar?

A long solar lease can change which fields you irrigate for decades. Before accepting a layout, establish who holds the water right, how much remains valid and what water the working farm will need.

Could my land work?

An eligible right holder may ask Washington Ecology to accept all or part of a valid irrigation water right as a temporary donation to the Trust Water Rights Program. The accepted portion is considered exercised and protected from relinquishment while held in trust, but cannot also be diverted for irrigation during the donation. A solar lease alone is not a general exception to relinquishment, and a submitted donation form is not acceptance. Work with Ecology, your irrigation district if applicable, and Washington water-rights counsel before land or water use changes.

Start with the right and the entire solar footprint

Washington law can relinquish all or part of a water right after five successive years of voluntary nonuse without sufficient cause. Statutory causes and exemptions may apply to particular facts; do not assume that installing solar panels or signing a private solar lease is itself sufficient cause. Ecology’s relinquishment fact sheet explains examples and the holder’s burden to substantiate the right. A temporary trust donation cannot restore a portion already relinquished before donation.

Gather certificates, claims, permits, change approvals, maps, priority dates, well or diversion records, meter and power records, crop and irrigation histories, aerial photos, leases and evidence of any claimed excuse for nonuse. A certificate’s face amount is not necessarily the amount still valid. Ask a Washington water-rights attorney and Ecology’s regional water resources staff to assess the right, its current extent and timing before deciding what can be donated.

Put the proposed arrays, fences, roads, underground lines, staging, grading, drainage and interconnection on a dated map alongside authorized places of use, irrigated fields, pumps, canals and access routes. Identify acreage that will stop receiving water and acreage that will remain farmed, including construction areas outside the fence. Compare the proposed option, construction, operating, extension and restoration periods with the start and end of any proposed donation. Changes to the footprint or schedule can change the water plan.

Illustration of a land parcel and surrounding landscape

Confirm who can donate and what remains usable

Do not assume the person farming or owning the parcel holds the water right. If water is delivered by an irrigation district or other provider, obtain the delivery contract, service records and the provider’s right documents. Ask the district and Ecology who holds the right, who may submit a donation, what approvals are needed and how a donation affects deliveries and assessments. Ecology’s guidance requires the donor to own the place of use, with a proportionate ownership condition for a partial donation. A district customer should not file as the holder without confirming authority.

Ecology allows temporary donation of all or part of a qualifying right. Its guidance says the donor must identify annual and instantaneous quantities, and the proposed donation plus retained use generally cannot exceed the highest beneficial use in the previous five years, subject to qualifying exceptions for excused nonuse. Ask Ecology how to document volumes, flow and the period used for your specific right. A trust acceptance is not a determination that the right or stated quantity is valid.

Allocate water with the farm operator: map the fields and seasons to remain irrigated, calculate their realistic needs and reserve the appropriate portion. Do not divert or withdraw the donated portion during the donation. Coordinate meters, delivery gates and operating records so the donated and retained quantities can be distinguished. Ecology may cancel a donation if the donated water continues to be used. A partial donation does not automatically protect an unused retained portion.

Request the donation and keep the acceptance

The right holder submits Ecology’s temporary donation form to the appropriate regional office. Identify the right, proposed annual and instantaneous quantities and an expiration date, and supply the supporting information Ecology requests. The agency reviews the complete form and sends an acceptance or nonacceptance; it may request evidence of recent use. Ecology’s guidance says there is no processing fee for a temporary donation. A form submitted, a delivery receipt or a public posting is not the agency’s acceptance.

Keep the acceptance email or letter with the water-right records. Check its quantities and term against the lease and farm plan, and resolve differences with Ecology before relying on it. Temporary donations are for preserving surface water or groundwater resources, without monetary compensation; they are not a water-bank sale or permission for a developer to use the donated water. A solar land lease and a trust donation are separate arrangements.

The trust right retains the underlying priority date. Ecology’s guidance says that when a temporary donation expires, the accepted quantities revert to the donor and are again subject to relinquishment rules. Acceptance does not cure prior relinquishment or guarantee that future irrigation infrastructure, delivery service or other approvals will be available. Ask Ecology and counsel how the particular right and accepted terms operate on return.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Manage a lease that may outlast the donation

Put the accepted start and expiration dates on a shared calendar, with reminders well before expiration and any lease extensions. Ecology says it does not notify donors when a donation expires. Its guidance allows a holder to contact Ecology about modifying duration or quantity before expiration; discuss options early and obtain written confirmation of any change. Do not assume the donation renews automatically or that a solar lease extension extends it.

If the project ends early, is delayed, expands or is assigned, revisit the map, farm plan and donation terms with Ecology, the district and counsel before changing diversions. Ask how withdrawal, cancellation, impairment concerns or expiration affect the right and what happens if land remains idle after trust ends. Keep use and nonuse records for the retained portion throughout the lease.

Ecology’s guidance says a donor must notify a buyer of land with appurtenant donated rights during the donation. Give the buyer the acceptance and terms, and coordinate the transaction with Ecology and counsel. Also inform the solar lessee, any assignee and the farm operator of the boundaries and restrictions; address notice, access, pumps, repairs, water use, responsibility for records, restoration and decommissioning in the land documents. Contract language should match the actual water-right and trust documents.

Discuss the land transaction with Sunland

Sunland welcomes land sale, lease and existing agreement inquiries nationwide. Share the approximate Washington location, acreage, proposed solar footprint and current irrigation arrangement; identify a district if one supplies the water. Sunland may contract for a property and then assign its interest to a specialist. Review the proposed transaction and assignment terms before signing, and use secure channels for detailed water-right and ownership records.

Questions landowners ask

Does a solar lease stop Washington’s five-year relinquishment rule?

Not by itself. Five successive years of voluntary nonuse without sufficient cause can result in relinquishment of all or part of a right. Ask counsel and Ecology whether an actual statutory cause or exemption applies.

Can I irrigate other fields while part of my right is donated?

Potentially, using a valid retained portion within its authorized terms. The donated portion cannot also be diverted or withdrawn during the donation. Confirm quantities and operations with Ecology and any irrigation district.

Does filing the form protect the water right?

Do not assume so. Ecology reviews a complete request and sends an acceptance or nonacceptance. Retain the acceptance and verify the quantities and term; acceptance does not establish validity or restore previously relinquished water.

What happens when the donation ends?

Ecology’s guidance says the accepted quantities revert to the donor and become subject to relinquishment rules again. Ecology does not send an expiration reminder. Plan ahead for the solar lease term and obtain confirmation of any requested change.

Sources & further reading

Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.