Wisconsin landowner guide

Can a Wisconsin solar project take possession before a ginseng garden is harvested?

A solar developer may want to fence or grade a Wisconsin field while cultivated ginseng remains in the ground. The owner and grower can use a garden map and a field-by-field handoff to protect the crop and give the project a workable construction schedule.

Could my land work?

Identify the grower and landowner, map each garden and its dug and undug acreage, and review the grower’s rights before signing a sale, lease or assignment. Wisconsin residents who grow cultivated ginseng root or seed must register annually with DATCP. Plan the harvest and required shipment certificates for the actual sales and destinations, and make possession of each field depend on a documented release.

Match the garden to the people and records

Collect the deed, survey, grower agreement, current registration, garden records and planting and digging history. The grower may be a tenant or another operator rather than the landowner. Identify who owns the roots, who can harvest them and who controls access; confirm the landowner’s name and address for each parcel with the parties.

DATCP’s 2026 cultivated grower application requests each garden location, county, garden ID, municipality, planting year, township, range and section, acreage and acres dug with year, road directions, and the landowner’s name and address. It instructs applicants not to add acreage to an existing garden but to create a new one. Reconcile those records with a dated map showing garden boundaries, dug and undug acres, shade structures, equipment routes and any disputed areas. Ask DATCP how to correct or report the particular records.

Illustration of a land parcel and surrounding landscape

Confirm registration and certificates

DATCP says Wisconsin residents growing cultivated ginseng root or seed must register with the department. Its 2026 application requires a completed registration annually and lists no annual grower registration fee. The application identifies several certificate types, including cultivated dry root, fresh or green root, live root or seed, and retail shipping. Ask DATCP which applies to the proposed transaction and allow time to obtain it.

DATCP says cultivated ginseng sold to a Wisconsin dealer or shipped out of state requires a shipment certificate. The application also lists a retail shipping certificate needed once yearly; ask DATCP which certificate and any retail exception apply to the planned transaction. Certificates have no expiration date as long as the grower is registered for the year of use. Dealers have separate registration and shipment obligations. For exports outside the United States, consult the U.S. Fish and Wildlife Service about applicable CITES requirements. Confirm the actual buyer, destination and applicable requirements before moving or selling the crop.

Keep cultivated and wild ginseng separate

This guide concerns cultivated gardens. Do not assume cultivated grower registration or shipment paperwork authorizes harvesting or selling wild ginseng. Wisconsin DNR administers a separate wild ginseng program; confirm the plant’s status, the harvester’s authority and the applicable rules with DNR before digging or moving roots where classification is uncertain.

Keep garden identification, planting and harvest records, certificates, buyer information and lot records together. Label harvested lots by garden and digging date so the grower can connect the physical roots to the relevant records and paperwork.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Release possession field by field

Attach a map and schedule to the transaction documents showing the developer’s initial work area and each garden reserved for harvest. Define which early activities are allowed, such as surveys, and which require a field release, such as grading, trenching or fencing. Set a harvest deadline and a notice, inspection and signed release process for each field. Record dug and undug acreage at each handoff; a closing or lease start need not be the date every field is delivered.

Reserve a practical route for people, digging equipment and harvested roots to reach the public road. Address gates, loading, work hours, safety coordination, road repairs and access through any construction fence. Set a procedure for weather delays or blocked access, extensions, crop damage and compensation. Decide who owns and may remove undug roots and structures after the deadline, and who restores the area.

Choose the transaction around the harvest

For a sale, negotiate any post-closing harvest and access reservation, its deadline and how it binds the buyer. For a lease, identify excluded gardens or staged possession and the grower’s retained access. If a solar interest may be assigned, address successor obligations, notices and who can approve field releases under the actual agreement. Obtain the grower’s agreement where existing crop or access rights are involved; the landowner cannot assume the solar contract changes those rights.

Ask Wisconsin counsel to coordinate the map and reservations with title and existing agreements. Keep dated photos, harvest logs, certificates and signed field releases with the transaction records. Contact DATCP at 608-224-5046 or DATCPginseng@wisconsin.gov for the registration and shipment facts.

Discuss the land with a solar developer

Sunland welcomes solar land inquiries in all 50 states, including Wisconsin. Share the approximate location and acreage, garden map, anticipated harvest dates and any grower rights so a preliminary layout can account for the staged handoff.

Questions landowners ask

Does the landowner have to register as the grower?

DATCP requires Wisconsin residents who grow cultivated ginseng root or seed to register. Determine who actually grows the crop; land ownership alone does not identify the grower.

Can the developer enter before harvest is complete?

The parties can negotiate limited early access and phased possession, subject to existing grower rights. Map permitted activities, the harvest route and the conditions for releasing each field.

Does one certificate cover every sale?

DATCP says cultivated ginseng sold to a Wisconsin dealer or shipped out of state requires a shipment certificate. The application also lists a retail shipping certificate needed once yearly. Confirm the certificate type and any retail exception with DATCP.

Sources & further reading

Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.