Put the working dairy and proposed routes on one map
Ask the project team for a dated layout showing the array, collector circuits, generator-tie route and proposed construction areas. With the dairy operator, mark barns, milking and livestock contact areas, the farm electrical service and facilities that will remain in use. Ask the utility and qualified professional to identify information they need; the drawing is a starting point for their review, not an electrical assessment.
Compare the drawing with the rights being offered. If a later design moves equipment or changes a circuit or route, ask the project team and professional whether the testing plan should change. Keep the revised drawing with its date and the agreement exhibit so everyone can identify the layout reviewed.

Ask for a baseline and a useful comparison
Before construction, ask the serving utility and a qualified professional who can evaluate livestock contact locations and possible utility and on-farm sources. What conditions and locations should be reviewed? When should a baseline be taken, and what follow-up after construction or operation would be useful? Ask how the professional will record relevant farm and project operating conditions so later results can be compared in context.
Give the professional available prior reports and a record of relevant farm electrical changes or repairs. Ask for written findings, the locations and conditions evaluated, and any recommendations. Wisconsin Public Service describes an investigation report with readings, graphs and electrical service mapping; the actual scope and report depend on the provider and farm. Do not attempt electrical testing yourself.
Check the project filing and settle practical arrangements
Ask the project team whether the Wisconsin Public Service Commission solar application filing requirements apply to this project. For applications covered by that document, section 5.16 asks applicants to discuss induced-voltage issues and any plans for pre- and post-construction stray-voltage testing. Request the filed discussion and any project-specific conditions. A filing discussion is not the same as a blanket requirement that every solar project test every dairy.
Before granting construction or route rights, ask who will arrange and pay for any agreed testing and follow-up, who may enter the farm, how visits will fit milking and other operations, and who receives reports. Identify a contact and a process for notice, investigation and follow-up if a concern is reported. Have your attorney put agreed responsibilities and access arrangements in the appropriate documents; do not assume a particular payment or testing right.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKnow whom to contact if a concern arises
Contact the serving utility and a qualified professional to discuss an investigation. Wisconsin DATCP’s Rural Electric Power Services (REPS) program can help farmers coordinate with utilities and electricians, understand regulatory questions and work through disputes. Ask how findings will be shared and what follow-up is appropriate. Electrical sources can be on the farm or the utility system; timing alone does not establish a solar project as the cause.
Discuss herd health concerns with the farm veterinarian. Retain dated reports, correspondence, electrical work records and project layouts, including any revisions, so the people investigating can consider the available history.
Discuss the property with Sunland
Sunland accepts land inquiries across all 50 states. An owner or authorized representative can ask about a solar sale or lease, or an existing agreement or project. Share the property location, acreage and timing, and explain that the dairy will continue, where proposed rights may run and what review or access questions remain. A conversation does not authorize entry or establish a project design.
Questions landowners ask
Must every Wisconsin solar project test every dairy?
No universal requirement follows from the solar application filing document. Ask whether its requirements and any project-specific conditions apply, and request the actual testing discussion.
Who should perform a stray voltage investigation?
Ask the serving utility and a qualified professional about the appropriate scope and provider. Do not perform electrical testing yourself.
Does a concern after construction prove the solar project caused it?
No. A professional investigation can consider utility and on-farm sources and the relevant operating conditions.
Who pays for testing?
Ask the utility and project team about the specific services and costs, and negotiate and document any project responsibilities. Do not assume testing is universally free.
Sources & further reading
Sources checked 2026-11-19. Local rules and program details can change. Check the requirements for the actual project.