Wisconsin landowner guide

Is the unused farm well sealed before solar construction?

Before grading or removing farm buildings for a Wisconsin solar project, locate any unused well and check whether it was properly filled and sealed. A buried or capped well is not, by itself, evidence of completed sealing.

Could my land work?

Mark the suspected location on the proposed site plan, search Wisconsin DNR well construction and filling and sealing records, and compare any report with the actual well. If the location or record is uncertain, ask a licensed well driller or pump installer and the DNR how to verify it before disturbing the area.

Find the well before the layout changes

Ask family members, tenants and former operators about old domestic, livestock and irrigation wells, including wells near removed buildings. Compare farm maps, photographs, construction reports and old utility or plumbing plans with the solar layout. Share suspected locations with the developer so grading, access roads and demolition can be planned around them while they are investigated.

DNR notes that inactive wells may be concealed in outbuildings or covered boxes, and may appear as a pipe, a covered concrete structure or a lined hole. Do not enter, uncover or disturb a suspected well yourself. A licensed driller or pump installer can inspect the property and help locate active or unused wells.

Illustration of a land parcel and surrounding landscape

Match a report to the actual well

Search DNR’s Well Construction Information System and its completed Well Filling and Sealing Reports. Gather the property address, parcel information, former owner names, approximate well location and any construction or contractor records. A report for another well on the farm does not establish what happened to this one.

If no report appears or the location does not match, do not assume the well is sealed or unsealed. Ask the driller or pump installer and DNR about the evidence needed to verify a formerly filled well and the next step. When verification is needed, request the completed filling and sealing report and accompanying statement describing the verification process from the professional; DNR guidance calls for filing both with DNR. Keep a copy and a marked map with the property records.

Resolve responsibility before work begins

DNR says wells removed from service must be properly filled, and only licensed well drillers and pump installers may fill and seal wells under Wisconsin law. Its property-purchase guidance says wells no longer in use must be filled and sealed within 90 days after removal from service. Ask DNR how the rules apply to the well’s history and whether a municipal ordinance adds requirements.

If work is needed, agree with the developer on who will arrange the licensed contractor, pay, coordinate access and provide the completed report. Have counsel reflect the allocation and timing in the actual agreement. Do not assume the solar developer’s plan resolves the owner’s well obligations.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Bring the question to screening

Give a prospective solar developer the approximate well location, known status, report and any uncertainty. Ask whether its planned roads, equipment or grading overlap the location and who will verify the record before construction.

Sunland reviews solar property and existing project agreements nationwide. An owner or authorized representative can submit the Wisconsin property location, approximate acreage and known well issue; detailed records can be shared privately if requested.

Questions landowners ask

Does a capped well count as filled and sealed?

A cap alone does not establish that the well was properly filled and sealed. Check the report and ask a licensed professional or DNR about verification.

What if I cannot find a sealing report?

Gather identifying details and ask a licensed well driller or pump installer and DNR how to verify the well’s status.

Who pays if sealing is needed?

The parties should agree on costs and responsibility in their transaction documents; applicable owner obligations still need individual review.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.