Identify the unit and its owner
Locate each chiller and associated piping, electrical equipment and access route on a site plan. Ask the current or former operator for nameplate details, model and serial number, refrigerant type and full charge, service and leak records, and ownership or financing documents. Record what remains unknown; a label alone may not establish what refrigerant is currently in the system.
Review leases, equipment agreements and sale records with counsel to determine who can sell or authorize removal. Ask the battery developer whether its site plan assumes the chiller, foundations and related piping will remain or be removed. Existing equipment does not establish usable electrical capacity for the new project.

Compare a sale with dismantling
Ask a buyer whether it proposes to buy the complete unit for reuse or individual components, whether it will disconnect or remove them, and what condition and access it requires. Ask a removal contractor for an itemized dismantling and disposal scope. Compare net proceeds after recovery, disconnection, rigging, transport, disposal, site repair and any testing, together with schedule and responsibility for damage or unexpected conditions.
The sale agreement should identify the actual equipment, what transfers and when, who controls the work, and what happens if the buyer cannot remove it. Ask the parties and a qualified refrigerant professional what rules apply to the proposed transfer and any circuit work. Do not assume that a buyer’s offer for equipment settles refrigerant handling or permits cutting charged lines.
Plan refrigerant recovery before disposal
For equipment and refrigerants covered by Section 608, EPA says chillers and other refrigeration equipment typically dismantled on-site before disposal must have refrigerant recovered in accordance with servicing requirements before disposal. Section 608 certification is required for technicians disposing of covered appliances other than certain small appliances and vehicle-related exceptions. The certification type depends on the equipment: EPA identifies Type II for high- or very high-pressure appliances and Type III for low-pressure appliances, or Universal for all types.
First ask a qualified professional which requirements apply to this unit and refrigerant. Certain substitutes and uses are exempt from the Section 608 subpart, including ammonia in industrial process refrigeration or absorption units and carbon dioxide in any application. Other obligations may apply. For covered work, ask the contractor to identify the technician and appropriate certification, recovery equipment, sequence and destination of recovered refrigerant. Ask for the proposed method and applicable requirements for this specific unit and refrigerant. Do not vent refrigerant or cut a circuit to speed removal. An intact sale for reuse and disposal are different transactions; have the parties confirm the applicable handling requirements for the actual work.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAgree on records and the handoff
For each unit, ask for a written recovery and removal record identifying the unit, location, refrigerant type, date, contractor and technician, quantity recovered and destination, plus receipts or transfer documentation where available. These are practical contract requests, not a claim that every field is federally required for every chiller. For covered appliances with a full charge of more than 5 and less than 50 pounds, federal rules specify technician disposal records, including recovery location, date and type, monthly quantities, and transfers for reclamation or destruction; the technician must keep them for three years.
Ask the contractor and environmental adviser whether other federal, state or local requirements apply to the unit and remaining materials, and who will retain the records. Have counsel allocate the costs, schedule, access and risk in the transaction. Sunland welcomes nationwide land and existing project inquiries: share the location, your relationship to the property, approximate acreage if known and the chiller issue; provide records privately if requested.
Questions landowners ask
Can a demolition crew simply cut out the chiller?
For a chiller and refrigerant covered by Section 608, refrigerant must be recovered before disposal of a unit typically dismantled on-site. Ask a qualified professional which requirements apply and arrange covered work with an appropriately certified technician.
Does selling the chiller eliminate refrigerant questions?
No. Determine whether the buyer is purchasing the complete unit for reuse or components, and who will disconnect and handle the refrigerant. Ask a qualified professional about requirements for the actual transaction.
Are the same disposal records required for every chiller?
No. Requirements depend on the equipment, charge and activity. Federal rules identify specific technician disposal records for covered appliances with a full charge of more than 5 and less than 50 pounds; ask for unit-specific records in the contract as well.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.
- 40 CFR 82.154: Prohibitions and exemptions
- 40 CFR 82.156: Proper evacuation and disposal records
- EPA: Stationary refrigeration safe disposal requirements
- EPA: Section 608 technician certification requirements
- EPA: Technician questions and answers, including disposal records
- EPA: Refrigerant sales restriction questions and answers