Start with the site and the parties
This guide concerns commercial lithium-ion battery energy storage on land, whether some modules are replaced while the site continues operating or the facility is closing. The property owner, battery equipment owner and operator may be different entities. Identify each one and the people authorized to answer questions, and review the lease, removal and restoration provisions, amendments and any agreed handover conditions.
Ask the operator what equipment, removed modules, materials and unfinished work remain on the property. Record who controls the site and access, who is responsible for the remaining items and costs, and the expected dates and contacts for resolving them. If receipt or other work is pending, agree on a follow-up process instead of treating a scheduled pickup as completion.

Reconcile the modules
Request an inventory that connects modules removed from the site to their next destination. Useful details include identifiers or quantities, reported condition, removal dates and logs, the responsible equipment owner or operator, and the proposed receiving facility. Compare the list with site records and ask the operator to explain missing, substituted or still-on-site items.
For each group, ask whether it is going to a legitimate evaluation for reuse, repair or repurposing, or to waste management, and who made that determination. A reuse label alone is not enough: EPA describes an actual, reasonable expectation of reuse and tracking as relevant to whether batteries sent for evaluation are waste. A decision to discard makes them waste; ask for the evaluation outcome and the subsequent destination of anything rejected.
Ask qualified people to determine the rules
Have the operator and a qualified environmental professional identify the generator and determine the applicable waste classification and management requirements for the actual modules. EPA says most lithium batteries are likely to be hazardous waste when discarded, and the generator is responsible for the hazardous waste determination. A property owner is not automatically the generator merely by owning the land; actual roles and circumstances matter, so seek site-specific advice.
Some hazardous waste batteries may be managed under federal universal waste rules, but a battery with a breached individual cell casing cannot be managed as universal waste. EPA says the scrap metal exclusion does not apply to lithium batteries. State requirements may be more stringent, so ask the professional to check the state program and explain the selected route.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landConfirm the receiving and transport arrangements
Ask for the receiving facility’s identity, acceptance of the identified material and its role in the proposed reuse or waste route. Obtain shipment identifiers and dates and, after delivery, confirmation of actual receipt that can be matched to the inventory. If an intermediate facility receives the modules, ask what evidence will show the subsequent destination and outcome; follow up on discrepancies or rejected loads. A receiving receipt documents delivery; it does not itself establish completed recycling, restoration, or release from environmental obligations.
A hazardous waste manifest is not automatically required for federal universal waste battery shipments, but DOT hazardous materials rules still apply when lithium batteries are offered for transport or transported in commerce. Have a qualified transport contractor assess the actual shipment and document its arrangements. PHMSA says damaged or defective lithium batteries capable of dangerous heat, fire or short circuit must meet the applicable requirements of 49 CFR 173.185(f); the recycling exception does not replace those requirements.
Document the handover and open work
Keep the inventory, condition and removal logs, facility acceptance, shipment records, receipt confirmations and correspondence together in a secure site file. These are practical diligence requests, not a prescribed document format. Ask the responsible parties to explain gaps and provide an updated reconciliation as evaluations and deliveries conclude.
Review the agreement with counsel before accepting the land or signing a release. A visibly cleared site does not by itself prove that restoration, other obligations or legal closeout are complete. List remaining work, responsible parties, deadlines and evidence needed for completion, and address what happens if a facility rejects material or a receipt is delayed.
Discuss the land and existing agreement
If the battery site continues operating, distinguish the replaced modules from equipment that remains under the existing agreement. Confirm access and responsibility for the continuing operation as well as any outstanding removal and restoration work.
Sunland welcomes nationwide inquiries about selling or leasing land, including property with an existing battery storage agreement. Share the location, approximate acreage, your relationship to the property and your goals. Provide agreements and site records privately on request through an appropriate secure channel.
Questions landowners ask
Does a statement that modules will be reused settle their status?
No. Ask for the basis for a reasonable expectation of legitimate reuse, tracking through evaluation and the destination of modules that are rejected or discarded. A qualified professional should assess the actual facts.
Does universal waste always need a hazardous waste manifest?
EPA says the federal universal waste rules do not require one for these shipments. DOT transport rules still apply, and state requirements may differ. Ask the responsible professionals what records and rules apply to the shipment.
What if the receiving facility has not confirmed delivery?
Record the shipment details, responsible contact and expected follow-up, and request actual receipt that can be reconciled to the inventory. Address the pending item in the handover terms.
Does an empty-looking site mean the land is ready to accept?
Not necessarily. Compare site conditions and outstanding work with the agreement and applicable requirements, and obtain advice before accepting the property or signing a release.
Sources & further reading
EPA and PHMSA guidance checked November 19, 2026. No individual site, equipment or transaction documents were reviewed. Local rules and program details can change. Check the requirements for the actual project.