Separate shares, delivery rights and land title
Start with the stock certificate and the ditch company’s shareholder ledger: identify the company, registered owner, certificate and share amount. Ask the company to reconcile the records and explain its transfer requirements, bylaws, assessments and delivery practices. Check deeds, title materials and any loan or pledge documents for interests or consents that could affect the transaction. Boulder County recommends researching deeds and asking the company about shares; its guidance describes certificate assignment and company registry updates for mutual ditch company stock.
A shareholding, a contractual right to receive water and title to land are distinct interests. A farm may have one or more of them, and the documents determine their scope. A ditch crossing a property does not itself give the landowner the right to use its water. The City of Boulder identifies shares, a water lease or another contractual delivery right as possible bases for use; its annual surplus water leasing program is a local example, not a promise that a lease will be available elsewhere.
In East Ridge v. Larimer and Weld Irrigation Co., the Colorado Supreme Court considered contracts for delivery to identified lands. The holder was not a shareholder, and the court found the particular contractual rights restricted to irrigation on those lands; they could not support the proposed change of use and diversion. This case illustrates why the actual contract matters, not a rule that all ditch shares or delivery agreements have the same restrictions.

Choose what stays with the farm
For a partial sale, have counsel prepare a schedule identifying each certificate, number of shares and owner, and stating which shares are retained and which are expressly transferred. Coordinate the schedule with the deed, purchase agreement, any assignment and company records; resolve pledges, required consents, unpaid assessments and closing steps. Avoid relying on a generic reference to water or appurtenances when the parties intend a particular allocation.
For a solar lease, specify whether the landowner retains the shares, who remains responsible for assessments and communications with the company, and whether the project receives any water or delivery rights. A lease of ground and a lease of water are different arrangements. If any share or delivery interest is to be transferred, identify it expressly and confirm the company’s procedures and any applicable lender or other consent before committing.
Test the allocation against the remaining farm’s needs. Identify the fields and operator who will use the water, the existing turnout and delivery arrangements, expected seasonal scheduling, and who orders water and pays assessments and maintenance costs. Company supply, priorities, governing rules and operating conditions can affect deliveries; retaining shares alone is not a guarantee of a particular volume or schedule.
Map delivery and preserve access
Put the retained farm and proposed solar area on one map with the ditch, laterals, headgates, turnouts, measuring structures, pipelines, pumps, crossings and irrigation equipment. Add the project’s panels, fence, gates, roads, cables, drainage, construction staging and temporary access. Trace how water reaches each retained field and how the company, farmer and repair crews reach the facilities throughout construction and operation.
For example, if a solar fence would isolate the turnout serving the retained field, reserving shares will not by itself solve access. Consider a different fence line or an enforceable access route with suitable gates and equipment clearance. Have counsel address existing ditch easements and the rights needed for operation, inspection, emergency repairs and replacement, including notice, damage, restoration and costs. Confirm the solution with the ditch company and affected operators before the layout is fixed.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landReview changes in use separately
Collect the relevant decrees and prior change orders, delivery agreements, diversion and irrigation records, crop history and historical use maps. Compare the historical use with what the retained farm and solar project propose. A share transfer, a solar agreement and a change in the place, purpose or manner of water use are separate questions. Do not assume that ownership of a share authorizes moving water to another field or using irrigation water for a solar project.
Ask Colorado water counsel and the ditch company what company action, engineering, water court or other authorization the particular proposal requires. Obtain any required approval before making the changed use; it may be conditioned or unavailable. Keep the transaction from depending on an unapproved change without addressing the consequences of delay, conditions or denial. Preserve historical records even if the immediate plan is to continue existing irrigation.
Prepare for a Sunland discussion
Sunland considers solar land opportunities nationwide, including sales, leases and parcels with existing agreements. Share the location, approximate acreage, ownership, the portion proposed for solar, and whether the farm expects to retain shares and continue irrigation. Provide the share and delivery documents privately when appropriate. Sunland may contract for a parcel and assign the opportunity to a specialist; that project transaction does not settle ditch company rights or replace the required water and legal review.
Questions landowners ask
Can I retain all my shares while selling part of the farm?
That may be possible, depending on the actual interests, company rules, title and obligations. Specify the intended allocation in the transaction documents and coordinate with the company and water counsel; also verify that the retained farm can still receive and use the water.
Does a ditch across the solar parcel give its owner water?
No. The physical ditch alone does not establish a right to use its water. Check for shares, a lease or another delivery entitlement and the conditions that apply.
Does the solar lessee automatically get my shares?
Do not assume that it does. Review the proposed lease and any related documents, expressly identify any interest granted, and ask the company and counsel about the required procedures and consents.
Can retained shares be used on a different field?
A share does not by itself authorize the proposed change. Compare decrees, company rules and historical use with the proposed field, and obtain advice and any required authorization before changing use.
Who pays assessments after a partial sale?
The parties should identify who holds each share and agree on allocation and closing adjustments, while confirming the company’s rules and billing arrangements. A private allocation should be coordinated with the company.
What if the solar fence blocks the turnout?
Revise the layout or establish a workable, enforceable access arrangement for the company, farm operator and repair crews. Review existing easements and the proposed access with counsel and the company before signing.
Sources & further reading
Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.