Find the agreements for the building and the equipment
Gather the building lease, solar amendments, site access or subordination agreement, roof warranty and roof inspection reports. Ask for any separate power purchase or service agreement that can affect the downtime or restart. Confirm who owns the building, who occupies it and who owns and services the solar system. Some documents may come from the seller’s or tenant’s files rather than the title report.
A signed 2020 lease amendment for a commercial building in Newark, California, illustrates the roles. The landlord and building tenant signed the roof-work terms. The amendment identified a separate solar equipment owner and made the tenant responsible to the landlord for the system and the solar owner’s acts. The landlord and solar owner also signed a companion subordination agreement that the tenant acknowledged and consented to.

Check notice and who can authorize the work
Ask the roof professional to identify the repair area and the solar provider to identify the equipment that must move. Check the signed documents for who can request the work, which notices are required and which contractors each party must approve. Put the notice and delivery proof, contractor access and staging, and any agreed limits on interruption in the work plan.
In the Newark amendment, the landlord could undertake roof work after giving the tenant 30 days’ advance written notice that describes the work and identifies which solar equipment needs to be removed. The clause waives that advance notice in an emergency. After the roof-maintenance notice, the landlord and tenant were to work together in good faith on a relocation plan, with the tenant responsible for carrying out or arranging the relocation at its cost.
Break the costs into separate line items
In the Newark lease, the original roof clause treated structural repairs and membrane work differently. The solar amendment permits the landlord to put the cost of specified membrane and other nonstructural roof work on the tenant. It also treats added expenses the landlord incurs because of the solar system during landlord roof work as operating expenses. The amendment also makes the tenant responsible for roof or building work and damage caused by installation, use, operation, maintenance or removal of the solar system.
Ask for written estimates and match each item to the applicable contract. Check how the parties will approve and document a change order or expense. Review any claim for missed production or power charges against the actual power or service agreement and any applicable insurance. The Newark lease filings do not specify what the separate power agreement charges during roof work.
| Cost to check | What to document |
|---|---|
| Roof work | Structural and membrane scope, contractor quote and who bears each item |
| Solar relocation and reinstallation | Work scope, authorized contractor, quote and paying party |
| Added expenses or damage | Contract clause, supporting invoice and who approves and pays |
| Interruption of solar service | Expected dates and any charges or credits under the power or service agreement |
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSet the handover conditions in writing
Ask the roof warranty provider what approvals and records it requires before and after the work. Agree who will document roof acceptance, who will confirm the reinstalled solar equipment is back in service and who will receive the records. Keep the roof acceptance and solar return-to-service confirmations with the repair plan.
If the work might continue after closing or possession, have counsel identify who retains access, directs the contractors, pays outstanding invoices and handles delays or warranty claims. Put any agreed completion condition, credit or holdback in the transaction documents. Give the buyer or incoming tenant the approved plan, open-items list and contact details so the work can continue on the agreed terms.
Describe the property and the proposed work
Sunland welcomes nationwide inquiries from owners and authorized representatives about selling or leasing property and assigning existing solar agreements. Share the approximate location, building use, who owns the rooftop equipment and when the roof work or handover is expected. Keep signed agreements, warranty records and contractor quotes for private review.
Questions landowners ask
Who pays to move the panels for a roof replacement?
Check the building lease, solar amendment and service agreement for the reason for the work and the party responsible for each cost. Ask for separate quotes for roof work and solar relocation and reinstallation.
Can roof work start sooner if there is an emergency?
Check the emergency, access and notice provisions with your contractors and counsel. In the Newark example, the roof-work clause waived its advance notice requirement in an emergency.
What should the buyer or incoming tenant receive?
Give them the agreed work plan, approval and notice records, cost allocation, roof acceptance, solar return-to-service confirmation and a list of any work still open.
Sources & further reading
The signed Newark lease instruments and quarterly report were checked November 20, 2026. The solar amendment illustrates the parties’ agreed procedure. The published records do not establish a roof replacement or how the separate power agreement handles an outage. Local rules and program details can change. Check the requirements for the actual project.