Landowner guide

Can you include tenant-installed solar in a building sale or new lease?

If an outgoing tenant installed solar on your commercial building or parking structure, the lease may determine whether the system stays, who owns it and who can require its removal. Find out what you can deliver before you price the system into a sale or promise it to a new tenant.

The short answer

Check the signed lease and solar exhibit against the installed equipment, warranty documents and the actual lease-end date. Determine whether you already own the equipment, expect to receive it when the lease ends or have a right to require removal. If the building changes hands first, document who can act under the old lease and what evidence the buyer or new tenant will receive.

Find out which agreement covers the equipment

Collect the signed building lease, solar exhibit, amendments, written approvals and equipment financing records. Ask the tenant for the approved installation proposal and records showing what was actually built. A lease may allow more than one installation arrangement, so identify the owner and the provisions that apply to the equipment on site.

A signed 2011 Mountain View, California, commercial lease allowed the tenant to propose and build solar on the parking structure. Exhibit E-3 also described circumstances in which the landlord could build its own facility. The landlord could finish the tenant’s project at the tenant’s expense under specified conditions, and the tenant remained responsible for maintaining that facility through lease expiration.

Illustration of a land parcel and surrounding landscape

Match the installed system to the transfer condition

In the Mountain View lease, the tenant’s facility was to stay as the landlord’s property at the end of the lease term if it used the specified panels or equivalent or better panels meeting the stated 25-year minimum power warranty. The tenant would leave the qualifying system in place and sign reasonably requested documents when needed to transfer title and related warranties.

Compare the as-built plans, model and serial numbers, substitutions and warranty documents with the actual lease condition. Ask what the warranty provider requires to transfer any remaining coverage. Gather maintenance and inspection records and ask counsel to review equipment ownership and any financing interests before you commit to delivering the system.

What the documents showWhat to resolve before the deal
You already own the equipmentIdentify the equipment included and confirm what title and warranty records you can deliver.
You have a conditional right at the end of the leaseIdentify the conditions, when they can be verified and who can request the transfer documents.
A removal election may be availableIdentify who can make it, the deadline and the work the tenant would need to complete.

Check the term end and any removal election

Use the signed amendments and actual renewal, holdover, termination or surrender documents to establish the relevant date. Review the general surrender language alongside the solar exhibit. Have counsel check which terms apply if the tenant leaves early and whether any action or notice is due before the handback.

If the tenant facility failed to meet the Mountain View lease’s equipment condition, the landlord could require the tenant to remove it at term end at the tenant’s expense and repair resulting damage. Check your own lease for who decides, how to give any required notice and how the tenant’s work will be inspected. If removal remains unresolved, give the buyer or incoming tenant a conditional handover plan.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Put the lease rights and handover in the deal documents

If you plan to sell before the old lease ends, have counsel check how the buyer receives the landlord’s lease rights and takes on any obligations. Identify who can request title or warranty documents, arrange an inspection, make a removal election or accept repairs. Agree what happens at closing if the equipment or its status cannot be confirmed in time.

For a new lease, specify which equipment the incoming tenant can use, when its use can start and who maintains it. If the old tenant still needs access for inspection or removal, coordinate that work and document how it affects the new tenant’s possession. Keep the final equipment list, acceptance records and any transfer or removal documents with the property file.

Discuss the property and the existing solar agreement

Sunland welcomes nationwide inquiries from owners and authorized representatives about selling or leasing property and assigning existing solar agreements. Share the approximate location, your proposed transaction and whether the outgoing tenant installed the solar equipment. Keep signed leases, financing records and warranty documents for private review.

Questions landowners ask

Can I include the solar equipment in the building sale before the old lease ends?

Identify any equipment you already own and any future right to receive it. Have counsel check which rights can pass to the buyer and describe what is being delivered at closing and what remains conditional.

Does receiving the equipment give me a new warranty?

Check the applicable warranty for its remaining term, transfer conditions and required documents. Confirm the remaining coverage in writing with the warranty provider.

Who pays if the outgoing tenant has to remove the system?

Read the removal and repair clause and check whether an election and notice are required. In the signed Mountain View example, the tenant would have to pay for removal and repair any resulting damage if the landlord exercised the contractual option.

Sources & further reading

The signed lease and First Amendment were checked November 20, 2026. They document the parties’ conditional terms. Actual construction, removal, transfer and present equipment ownership are unverified. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land