Establish what land the supplier holds and why
Gather the deed and any taking, acquisition or acceptance records, including stated purposes and restrictions. Identify the owner, the public water supplier and its public water system (PWS) identification number. Collect a current survey, assessor parcel numbers, title report, easements, conservation restrictions, leases and records of any earlier MassDEP approval. Ownership alone does not establish every restriction; the purpose, use and governing documents matter.
Map the proposed battery enclosure, access road, underground cables, drainage, temporary construction areas and utility connection against the land held for the water supply. Obtain source, watershed and Zone I maps and source protection records from the supplier and appropriate agencies. A mapped protection area is useful context, but location on a map alone does not settle whether the disposition or change-of-use rule applies. Likewise, a small footprint or a proposed carveout needs review against the actual records and use.

Ask MassDEP about prior review before the transaction
The operative 310 CMR 22.24 requires prior written approval for the specified disposition or change of use of land used for water supply purposes. The regulation says MassDEP will not approve unless the supplier demonstrates to its satisfaction that the action will have no significant adverse impact on the supplier’s present and future ability to provide continuous adequate service under routine and emergency conditions. This review is distinct from a general inquiry into whether the parcel lies in a drinking water protection area.
Give the regional MassDEP Drinking Water Program the deed and purpose, supplier and PWS identification, source and protection maps, proposed boundaries, intended rights and use, existing approvals and any proposed carveout. Ask whether the land and transaction are covered, whether prior written approval is required, and how WS 26 or other review should be handled. Do not assume that an old approval covers a new lease, assignment, sale or battery use: supply the approval and proposed changes for the agency’s review. MassDEP’s WS 26 page says public water suppliers or their representatives must apply to dispose of water supply land or acquire land for water supply purposes, using the online ePLACE process.
Examine the transaction and retained water operations
Show which party would own or control each area and whether the agreement grants exclusive possession, access, utility easements or assignment rights. Consider how installation, maintenance, emergency response, drainage and eventual removal could affect water operations and access to sources and infrastructure. The supplier and its technical advisers should develop the information MassDEP needs to evaluate the proposal, including impacts under routine and emergency conditions.
Ask counsel to examine municipal or district authority, deed restrictions and other required approvals. Article 97 and any legislative review depend on the land, its dedication and the proposed disposition; do not assume that every water supply parcel or battery agreement automatically requires an act of the Legislature. Check applicable local, environmental, fire and electrical requirements separately. The MassDEP regulations page labels its February 2026 amendments proposed; verify the current operative text and agency guidance when the proposal is reviewed.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPrepare an owner inquiry
An owner or authorized representative can begin with the parcel location, acreage, supplier identity, source and use information, existing restrictions and the proposed sale or lease boundary. Flag any existing contract or assignment and share sensitive records privately when requested. A preliminary inquiry is not agency approval, and the agreement should allow time for the supplier and its advisers to resolve required reviews before the relevant transaction or change in use.
Sunland welcomes land sale, lease and existing agreement inquiries from owners and authorized representatives across the United States. Sunland may contract for a parcel and then assign the agreement to a specialist. A specialist can also discuss an existing contract or assignment. Any required water supply land approval must be addressed separately.
Questions landowners ask
Does a battery lease on water supply acreage require MassDEP approval?
If the land is used for water supply purposes and the supplier’s proposed lease falls within 310 CMR 22.24, prior written MassDEP approval is required. Provide the records and terms to the regional Drinking Water Program and ask about applicability and the appropriate review.
Does being inside a Zone I automatically answer the disposition question?
No. Source and Zone I maps help identify water supply concerns, but the supplier’s interest, land use, proposed transaction and applicable approvals must be examined. Other Zone I restrictions may also matter.
Can an existing approval be used for a new battery project?
Do not assume it covers a new transaction or use. Give MassDEP the prior approval and the proposed layout and agreement, and ask what further review is needed.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.