New Jersey landowner guide

What solar agreement can you sign on a New Jersey preserved farm?

If a developer offers rent for acreage on your preserved New Jersey farm, compare the lease exhibit with the recorded deed of easement and the preservation survey. The state’s preserved-farm solar rules bar leasing land subject to the easement for solar generation. The rules allow the farm owner to apply for a qualifying system the owner buys outright or acquires by the end of an eligible equipment agreement.

Could my land work?

Ask the State Agriculture Development Committee (SADC) and the easement holder to review the proposed layout and equipment ownership. Ask who will own the system, which meters or distribution lines it will serve, and how much of the farm it will occupy. If you may sell the farm during an equipment agreement, check that the agreement includes the required unconditional assignment to a subsequent owner who takes title before the term ends.

Compare how the system will be owned and used

For a lease-to-own equipment agreement under the preserved-farm rules, the owner uses income or credits from solar generation to buy the system at the end of the term. The agreement can run for up to 20 years and must provide for unconditional assignment to any subsequent owner who takes title to the farm before the agreement ends. Ask the installer for the end date, purchase terms and assignment language before negotiating either the equipment agreement or a sale of the farm.

For a system serving the farm or offsetting its energy costs, the size test can be based on the previous calendar year’s energy demand plus 10 percent, with special treatment for rooftop equipment already in place on January 16, 2010. The owner can instead elect the one-percent occupied-area test. For a system connecting directly to the distribution grid to sell wholesale power, the SADC rules use the one-percent occupied-area limit alongside the other eligibility criteria. Have the installer show which path it proposes and ask the SADC to confirm the treatment of any existing solar, wind or biomass equipment.

Illustration of a land parcel and surrounding landscape

Map the full area affected by the proposal

Start with the recorded deed of easement and the preservation survey. Ask the easement holder to confirm the restricted boundary and identify any severable or nonseverable exception areas. The rules require facilities serving a use in a severable exception area to stay entirely within it. Different siting limits apply to facilities primarily serving nonfarm or nonresidential uses in a nonseverable exception area. If an installer proposes crossing an exception boundary, show the crossings to the SADC and easement holder before accepting the layout.

Have the installer map the equipment, nonfarm access roads, areas that would become unavailable for cultivation, and cable routes with their depths. The occupied-area calculation includes related infrastructure and can include rooftop equipment. The rules can count the preserved land and exception areas still within the farm in the one-percent farm-area calculation. Ask the SADC to confirm both acreage figures and compare the layout with field access, drainage and irrigation.

Put the approvals and agreement in the closing file

Use the SADC application for rooftop or ground-mounted solar. Gather the recorded deed showing ownership, the surveyed site plan, site photos, the equipment purchase or lease agreement, the prior calendar year’s energy records and documentation for the proposed electrical connection. Include the most recent farmland assessment form approved by the local tax assessor. Ask whether your farm also needs written confirmation from the Pinelands Commission or advance written approval from USDA’s Natural Resources Conservation Service. Obtain SADC approval before construction and check any approval conditions against the final exhibit.

If an offer depends on a proposed array, discuss making the relevant closing or construction rights contingent on the approval and on an agreed layout. If the farm already has solar, give the buyer the SADC decision, the approved layout, the equipment agreement and any required assignment documents. Confirm how payments and credits will be handled at closing. For a sale, lease or assignment inquiry, tell Sunland where the farm is and whether the offer includes land, equipment or an existing agreement. Sunland accepts inquiries nationwide.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Questions landowners ask

Can a developer lease the preserved acreage for solar generation?

The SADC rule bars leasing the land subject to the recorded development easement for solar generation or production. If the proposed layout is on an exception area, have the SADC and the easement holder confirm which rules apply to the equipment, roads and wiring.

Does the one-percent calculation cover more than panels?

Yes. Where the one-percent test applies, the occupied area includes supporting infrastructure and land that can no longer be farmed because of the installation. Ask the installer for the area breakdown and the SADC to confirm the farm acreage used for comparison.

What should I check if I sell before the equipment agreement ends?

The rule requires the equipment agreement to include an unconditional assignment to a subsequent owner who takes title before the term ends. Ask counsel to match the assignment, the remaining purchase terms and the SADC approval documents with your closing papers.

Sources & further reading

Sources checked 2026-11-19. Local rules and program details can change. Check the requirements for the actual project.