New York landowner guide

What land rights does NYISO need for a battery storage request?

When a battery developer asks for a land option to support a New York Independent System Operator interconnection request, ask for the filing date and the map that will accompany its land rights. You can use those records to compare the rights the project needs with the ground and activities the option would restrict.

Could my land work?

Under NYISO Attachment HH, site control for a covered request means sufficient land rights to develop, build, operate and maintain the facility for at least ten years from the date the applicant submits the Interconnection Request. An option to purchase or acquire a leasehold can qualify as evidence. The tariff restricts mutually exclusive projects on the site and allows compatible uses alongside the facility. Check the option and its exhibits to see which uses you would actually retain.

Start with the Interconnection Request date

Ask the developer to identify the NYISO process it is using and provide the submitted or planned Interconnection Request date. The ten-year period in Attachment HH starts at submission. Ask the developer to show you the rights it plans to rely on through that period, including relevant term, exercise and expiration provisions.

Section 40.1 recognizes ownership, a leasehold or a development right, an option to buy or lease, or other documents clearly establishing the right to occupy a sufficient site. If the developer wants an option, ask how long it wants to hold the option and what rights exercise would secure. The option period and the duration of the rights the developer plans to demonstrate are separate items to review.

Illustration of a land parcel and surrounding landscape

Map the rights you would grant and keep

In the cluster study process, Section 40.5.5 generally requires the applicant to show full facility site control with the Interconnection Request, subject to a defined regulatory limitations exception. Ask the developer for the site control exhibit and its applicable acreage and other requirements. Compare the area it plans to show NYISO with the area your option would restrict, including any land it would hold for a future change.

For example, a site owner might agree to hold one portion of a farm for the battery facility and continue using a farm lane and another field. Have counsel check the exhibit, existing rights and exclusivity language together. If the uses can coexist, document where they can continue and how the agreement addresses any shared area. The tariff permits compatible uses such as farming or ranching. The signed agreement determines the rights the parties grant or reserve between themselves.

Check for competing or shared land commitments

Show the developer and your counsel any existing options, leases or other rights over the same area. Ask which rights could prevent the proposed facility or an existing project from using that land. Resolve any conflicts before agreeing to overlapping commitments.

In the cluster study process, Attachment HH allows more than one request for a site where its site control rules permit it and each request meets the submission requirements. Where multiple interconnection customers propose multiple generating facilities that share a site, their requests must include a contract or other agreement allowing shared land use. If an amendment changes the land rights the applicant demonstrated, ask who will coordinate the change. The applicant must promptly inform NYISO of any material change to that demonstration.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Discuss your property or agreement

Sunland welcomes inquiries from owners and authorized representatives nationwide about selling or leasing battery storage property or assigning an existing agreement. Share the general property location, your role and the transaction you are considering. Keep private agreements, site exhibits and interconnection filing records out of the initial inquiry.

Questions landowners ask

Does the NYISO rule require a ten-year private option?

The ten-year requirement measures the sufficient land rights from the date the applicant submits the Interconnection Request. An option to purchase or acquire a sufficient leasehold is one way to document those rights. Ask the applicant to show how the proposed option and underlying rights satisfy the applicable requirement.

Can I still farm part of the property under a battery option?

Attachment HH allows compatible uses alongside the proposed facility. Ask for an exhibit showing those uses and have counsel review how the option reserves them and addresses access or other areas the facility and existing uses may share.

Does every New York battery project use Attachment HH?

Confirm which interconnection process the developer is using. This site control check is for an Interconnection Request covered by NYISO Attachment HH. A project applying under a separate utility distribution process should check that process and its own documentation requirements.

Sources & further reading

Checked November 21, 2026 against the NYISO Attachment HH tariff sections accepted effective July 29, 2026. Local rules and program details can change. Check the requirements for the actual project.