Battery storage / Landowner guide

Transmission-connected battery storage: what landowners should ask

A plain-language guide to large battery proposals, project records, land reservation and the connection rights needed beyond a nearby transmission line.

The short answer

A large power line near your land can justify further investigation. It does not establish space to connect, an affordable upgrade or an approved project. Ask for the proposed connection point, project reference and study status before treating an approach as a near-term lease.

Start with the proposal, not the line

Ask the developer to show where equipment would sit and where it would connect. Which land do they control between those points? Would new electrical facilities, road crossings or neighboring rights be needed? Have the entire route marked, even if parts remain preliminary.

Explain the uses you need to preserve. A transmission-connected proposal can involve more than the fenced battery area, so ask which rights would be permanent and which areas are only needed during construction. Do not compare offers solely by the equipment acreage.

Model landscape illustration of battery enclosures, an electrical substation and a proposed site layout.

Ask for a project reference you can check

PJM publishes separate serial and cycle service-request records. For a proposal using PJM’s process, ask for the project reference and the relevant record, rather than searching only by a marketing name. Ask the developer to explain the current status and any studies available.

A record shows a request is being processed; it does not prove construction will happen. Ask what milestones remain and which decisions could stop the project. For land outside PJM, ask which grid operator and utility have the applicable records.

Reference: PJM: service request records

Understand why the developer wants an option

PJM’s current process resources discuss site control and financial readiness. Its September 2026 first-cycle announcement also describes proof of site control as part of project viability. This helps explain why a developer may request land rights before construction is certain.

It does not mean you should accept an indefinite reservation. Ask what land the option covers, how long it lasts, what you are paid during investigation and whether extensions require your agreement. Ask which retained uses would be allowed while studies proceed.

Reference: PJM: interconnection reform and site-control resources · PJM: September 2026 first-cycle study announcement

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Separate study progress from construction readiness

Ask what the studies have established and which upgrade costs remain uncertain. Has a connection point been agreed, or could it move? Are required agreements complete? Have the developer distinguish a submitted application, a study result and permission to begin building.

You do not need to predict the grid outcome yourself. You do need a clear explanation of how unresolved costs and delays affect your land agreement. Ask when reserved areas are released if the project is reduced or abandoned.

Ask how a connection dispute affects your reservation

A September 30, 2026 FERC complaint by New England project companies, including River Mill Storage, challenges upgrade-cost allocation and requests relief from connection agreement, deposit and withdrawal requirements. ISO New England’s October 1 motion opposes the requested shortened response period. These are the parties’ filings, not a decision granting the requested relief.

For your own proposal, ask whether a pending study, disagreement or requested deadline change affects the company’s ability to proceed. Request the actual project reference and documents. A statement that the company expects relief should not leave you uncertain about when your option ends.

Ask the developer to explain the choices it faces. Could it accept the current costs, change the design, seek a different service arrangement or stop the project? Which choice would require more land or a different electrical route? Have any change to your rights shown on a revised drawing.

Compare each unresolved milestone with the option and rent schedule. Does an extension happen automatically, what does it cost the company and when must it release the land? If operating rent starts only after construction or operation, ask what you receive while the connection issue remains unresolved.

Keep project deposits separate from your own payments. Money posted for electrical review is not evidence that option money or rent has been paid to you. Ask who bears further study and upgrade expenses and whether any proposed clause could shift those costs to the landowner.

Reference: FERC eLibrary: September 30, 2026 project-company complaint and waiver request, EL26-112 · FERC eLibrary: October 1, 2026 ISO New England motion opposing a shortened comment period, EL26-112

Keep decisions, deadlines and property rights in one file

Ask for the dated result when a pending request is decided. What was granted, what was denied and what conditions remain? Request an explanation of whether the decision concerns only a deadline or changes the connection arrangement itself.

Keep the decision with the matching project reference, drawing and land agreement. If the company says its schedule has changed, ask for the resulting reservation and payment dates in writing. An updated project forecast does not explain an amendment to your private agreement.

If the project stops or changes owners, ask who arranges release of unused rights, repairs investigation damage and supplies replacement contacts. Include a tenant or farm operator when access or working areas are affected. The response to a connection problem should leave you with a clear next step for the property.

Ask who will own the project later

If the developer expects to transfer the project, ask how that would affect your agreement and who would be responsible for payments, site work and removal. Request an explanation of any proposed assignment rights and the responsibilities that continue after a transfer.

Keep the project reference, site drawing and agreement documents together. If the company or project name changes, those records help you understand whether the new discussion concerns the same land and connection proposal.

What to send for an initial conversation

Send the property location, contact details and what portion could be available. Add the parcel number, utility and a prior proposal reference if known. Describe existing lines or easements without assuming they grant a right to connect.

You can inquire without choosing a battery rating or signing an option. Sunland can start with your property information and identify the questions that need further work. A transmission-scale inquiry remains subject to project-specific feasibility and commercial review.

Questions landowners ask

Does a transmission line beside my property guarantee a project?

No. The connection point, rights, studies, costs and land-use approvals need project-specific investigation.

Does a queue record mean construction is approved?

No. Ask what the record establishes and which studies, agreements and other approvals remain.

Can I ask about my property before signing an option?

Yes. Send the location and any proposal records you have. An inquiry does not reserve your land.

Does a requested waiver mean a project’s deadline has changed?

A request alone does not establish that. Ask for the actual decision, the deadline it affects and what that means for your land reservation and payments.

Sources & further reading

Sources checked 2026-10-06. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land