Identify the owner and the rights proposed
Obtain the deed, title commitment, survey, asset records, existing easements, mortgages and corporate authority documents. This guide addresses an actual New York gas or electric corporation with fee-owned land and a proposed third-party transaction. A municipal authority, another utility affiliate or a private owner beside a utility line may face different rules. Ask counsel to determine the owner’s status, the property interest and the Commission’s jurisdiction.
Map the proposed battery equipment, fence, setbacks, road, underground cables, construction staging and connection route against the utility parcel and existing facilities. Identify retained inspection, emergency and maintenance access. A proposed lease or easement may affect a larger area than the battery pad, and nearby infrastructure does not establish that an interconnection is available.

Test current and future utility needs
Ask operations, engineering and planning staff to identify active equipment, underground facilities, safety clearances, access and emergency uses. Compare the proposal with adopted capital plans, anticipated load growth, maintenance and replacement needs. An empty-looking lot can be reserved for a future line, substation expansion or access; an option granting exclusive control may conflict with those plans even before construction.
Compare retaining the land, granting a limited-term arrangement that preserves future utility use, and selling the interest. A sale can provide immediate proceeds but permanently change control; a lease can retain title while limiting access for its term. Request a written operational assessment, including what rights must remain and whether the proposed work would impair safe and adequate service.
Determine the section 70 path
Public Service Law section 70 generally requires written Commission consent for a covered transfer or lease of a gas or electric corporation’s franchise, works or system, or a part of them. The statute also contains a limited notice route based on the transaction’s original cost and the corporation’s annual gross revenues, while reserving the Commission’s power to require review and written consent. The original-cost measure is not the proposed sale price or rent.
Ask utility counsel to apply the exact statutory language to the owner and interest, including the relevant original-cost and revenue records and any applicable exception. Do not assume a low offer, an empty parcel or a short lease removes the need for review. Equally, do not treat every transaction as subject to an identical approval sequence or promise a universal decision date; the actual path and Commission action matter.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landBuild a customer-value and accounting record
Gather an appraisal or other appropriate valuation, marketing history, offers and the proposed financial terms, including rent, escalation, sale consideration, costs and any retained rights. Ask the regulatory and accounting teams how the transaction would be recorded and how costs and proceeds affect utility customers under the applicable law, rates and orders. A high headline price is not a complete customer-benefit analysis.
A July 2026 Commission order concerning a utility office lease illustrates the type of review: the Commission considered service, transaction economics, customer effects and accounting. That order’s facts and conditions apply to that proceeding, not automatically to a battery site. Prepare evidence for the actual proposal and ask counsel what petition, notice, accounting treatment and order compliance are required.
Use utility-specific site screening carefully
National Grid’s 2025 benefit-cost analysis handbook describes a process for certain non-wires alternatives: checking whether utility-owned land is suitable, unused and not identified as needed in filed five- or ten-year capital plans, then considering environmental review and valuation when a bidder expresses interest. It does not promise that a site will be available or that every New York utility uses the same procedure.
That handbook discusses term-limited leases where future utility use is anticipated and notes that a sale may involve an open-market offering for customer benefit. Use the responsible utility’s actual policy and solicitation, if any, to determine how sites are screened, offered and valued. Do not assume every disposition requires an auction or that every lease must have the same term as a particular project deferral.
Compare the offers and protect retained operations
For a sale, evaluate the legal description, value, retained utility easements, access, subdivision and any liens or releases. For a lease, compare the term and extensions, rent, exclusive area, construction rights, assignment, insurance, decommissioning and restoration security. Ask engineering to test both the permanent layout and temporary work areas against operations and future capital plans.
Allocate appraisal, environmental study, application and legal costs in the proposed agreement, subject to applicable utility policy and regulatory treatment. Address the effect of changed project boundaries, delayed approvals or a denial. An initial indication of interest or preliminary appraisal does not itself authorize the utility to grant possession or guarantee the customer accounting outcome.
Coordinate review and the closing schedule
Give counsel and regulatory staff the operational assessment, valuation and marketing evidence, original-cost records, proposed accounting and complete transaction documents. Identify who will prepare any filing, respond to Commission questions and satisfy conditions in a final order. The utility’s corporate approvals and lender or title requirements are separate from the Commission process.
Make diligence entry, exclusivity, closing and possession consistent with the actual approvals and retained utility rights. Independently assess environmental and local siting review, fire access and the interconnection process. A Commission disposition decision does not itself approve the battery project or establish grid capacity.
Discuss the property with Sunland
Sunland welcomes nationwide battery storage land sale, lease and existing agreement inquiries from owners and authorized representatives. A utility representative can share the location, approximate acreage, current use, intended transaction and known regulatory process. Provide sensitive operating and financial records privately to appropriate reviewers.
Sunland may contract for a property or agreement and then assign its interest to a specialist developer, subject to the actual terms and required consents. The utility and its advisers should establish authority, customer impacts and required regulatory action before a binding commitment.
Questions landowners ask
Does an unused utility parcel automatically qualify for a battery lease?
No. Check actual and planned utility needs, retained facilities and rights, the utility’s authority and the applicable regulatory process. A vacant appearance does not establish availability.
Is the section 70 original-cost measure the battery offer price?
No. The limited statutory notice route refers to original cost and the corporation’s annual gross revenues. Counsel should apply the exact language to the actual transaction.
Must every utility land sale be auctioned?
Not under a universal rule stated here. Review the actual utility policy, applicable process and the valuation and marketing evidence needed for the transaction.
Does Commission consent establish battery interconnection?
No. Disposition review, project siting and utility interconnection are separate matters and require their own assessment.
Sources & further reading
New York statute, Commission order and utility materials checked November 18, 2026. The cited order and National Grid process are examples, not determinations for another utility or battery project. No individual property or proposal was reviewed. Local rules and program details can change. Check the requirements for the actual project.