Confirm the specific field and current status
Golden nematode is a soil-dwelling pest subject to federal and New York quarantine programs. APHIS identifies portions of New York as regulated; New York says its quarantine has changed over time. A county name, old farm record, neighbor’s recollection or broad map does not establish the current status of your particular field. Being in a regulated area does not by itself establish that the parcel is infested.
Gather the tax parcel number, address, survey or boundary description, field names, existing notices and any prior agency correspondence. Include the proposed entrance, survey area, equipment staging and routes. Contact the New York Department of Agriculture and Markets Division of Plant Industry at 518-457-2087 or Plants@agriculture.ny.gov, and the APHIS golden nematode program at 607-566-7059. Ask each agency to confirm which boundaries and rules apply and who will coordinate the response. Keep a dated written response with the site documents.

Describe the proposed work before granting access
Ask the developer for a written scope and schedule covering each visit, contractors and equipment, site entrance, proposed survey or construction footprint, staging, and any anticipated soil or equipment movement. Share it with the agencies and ask which activities may proceed, what authorization, inspection or other documentation is required, and who must obtain it. Federal and state requirements can differ; ask about both, including activity entirely within New York.
Do not assume that a solar lease, an owner’s access letter, a prior farm operation, or a contractor’s general assurances satisfy the agencies’ requirements. Ask the agencies to identify the project-specific documents and any conditions and timing in writing. Keep contractor access conditional on those requirements being met; have your attorney review how that condition fits existing agreements. Leave technical sampling, treatment and movement procedures to the responsible agencies and qualified personnel.
Plan for timing and an alternate layout
Ask the agency contact when it can review the scope, what additional information is needed and whether any inspection or documentation must precede a scheduled visit. Do not promise a start date until those steps are understood. Identify who will notify the owner and farm operator if the schedule or scope changes and whether a revised agency review is needed.
Ask the developer for an alternate layout or route that avoids the affected field, if practical, and present it to the agencies for review. A line drawn outside an assumed boundary is not itself clearance. Consider the impact on working fields, roads, drainage and neighboring rights, and ask how the alternative changes acreage, costs and the project schedule.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPut the access arrangement in writing
With your attorney, review the existing option, lease or access agreement before responding. Identify permitted activities and locations, notice, dates, restoration, damage, insurance, responsibility for obtaining agency approvals and paying related costs, and what happens if access is delayed or the layout changes. Coordinate with any farm tenant or operator whose rights or work may be affected.
Keep a shared record of the agency’s direction, required authorizations, approved scope and project contact. If the work changes or a required document is missing, pause the affected activity and ask the agency and project team how to proceed. Sunland welcomes land and existing project inquiries nationwide; share the county, acreage and general access question initially, and provide site records privately when appropriate.
Questions landowners ask
Does a regulated county mean my field is infested?
No. Only portions are regulated, and inclusion in a regulated area does not itself prove infestation. Ask the responsible agencies to confirm the current status of the specific field.
Can I authorize the contractor myself?
You can address land access in your agreement, but your permission does not replace applicable agency requirements or project-specific authorizations.
Can the developer avoid the affected field?
Perhaps. Ask for an alternative and have the agencies review the actual boundaries, route and planned activities before relying on it.
Who decides what procedures apply?
The responsible state and federal agencies can identify the applicable requirements for the specific work. Ask them about documentation, timing and qualified personnel.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.