Can I keep farming my land under the Oak Run Solar project?

Sources checked

Ask for a field map and a written right to farm

If you want to keep cropping or grazing land at Oak Run Solar in Madison County, Ohio, ask the developer to map the acres your farm can use and the gates and roads you can use to reach them. The Ohio Power Siting Board set farming benchmarks for the project as a whole. Before committing land, agree in writing on who can farm each field, when access starts and what happens if construction or a design change takes acres out of use.

Oak Run’s plan calls for crops and livestock alongside the solar panels. If your tenant already farms the tract, compare the proposed farm area with the current farm lease and the solar option. Include any field outside the array fence that depends on a gate, farm lane or turn area inside the project.

Read the farming conditions in the Oak Run order

The Ohio Power Siting Board approved the project in March 2024 subject to conditions. Paragraph 221 of its order sets out benchmarks for the solar farming program. It calls for 1,000 sheep and 2,000 crop acres after the first year of operation and for at least 70 percent of the farmable project area, or 4,000 crop acres, to be in agrivoltaic use within eight years of operation.

The same paragraph calls for a plan that shows farm access points, equipment staging and space for machinery to pass. The plan also covers cropping or seed choices, the timing of farm activities and livestock management. Use that plan to identify the fields and routes that would work for your operation.

In May 2026, the Supreme Court of Ohio returned part of the case to the board for closer review of visual impacts. On November 19, 2026, the board announced that it reaffirmed on rehearing that the developer’s substation drawings or simulations met the visual requirements at issue. Ask for the current plan and construction schedule before setting a date for farm access.

Sources Ohio Power Siting Board, Oak Run opinion and order, paragraph 221 · Ohio Power Siting Board, Oak Run certificate decision and conditions, paragraphs 278–282 · Supreme Court of Ohio, May 26, 2026 Oak Run opinion and remand · Ohio Power Siting Board, November 19, 2026 Oak Run rehearing update · The Columbus Dispatch, coverage of Oak Run's November 19 rehearing

Check which fields you can reach and work

Give the developer your parcel number, field boundaries and the routes the current operator uses. Ask for a dated drawing that shows the planned solar equipment and the land proposed for crops or grazing. Walk or review the plan with the person who will farm it and use the dimensions of their actual equipment.

Farm needWhat to check on the drawing
Getting to the fieldMark the gate, the route from the public road and any crossing shared with the project. Check the route to retained fields beyond the fence.
Running machineryCheck gate width, clearance around racks, row spacing, headlands for turning and where equipment can stage.
Rotating crops or sheepIdentify the blocks available by season and the land needed for water, fencing or moving stock between blocks.
Keeping the current cropCompare the harvest date with survey entry, road work, fencing and construction for each field.

Sources Ohio Power Siting Board, Oak Run opinion and order, paragraph 221

Agree on farm access before committing the tract

Take the plan, existing farm lease and proposed solar option to your attorney. If continued farming is part of the deal, ask how the farm operator will get enforceable use of the mapped acres. A landowner who wants to keep the current tenant in place should bring that tenant into the discussion before agreeing to a move-out or construction date.

  • Identify who can crop or graze each field during the option, construction and operation. Agree on harvest and handover dates for the crop already in the ground.
  • Put gate access, work periods, construction notice and any temporary routes on the agreement or its exhibit. Include any route that the operator needs to farm retained acres.
  • Agree on who pays for crop loss, lost access or an acreage reduction if the project moves a fence or gate. Ask your attorney how any redesign affects the land and access rights you have agreed to give.

Common questions

Does Oak Run’s farming acreage target give my tenant a field?

The benchmark applies across the project. Ask which fields the developer proposes for your tenant and get the operator’s right to use them in a signed agreement.

How do I protect access to my acres outside the array fence?

Mark the lane, any shared gate and the field entrance on a dated exhibit. Ask your attorney to specify who can use that route during construction and operation and what happens if the developer moves it.

When do the Oak Run benchmarks start?

The March 2024 order measures those benchmarks from project operation. Check the proposed construction and operations schedule separately when writing a deadline for harvest, handover or farm access.