Pennsylvania landowner guide

What if underground mining may be beneath a Pennsylvania battery storage site?

If underground mining is known or suspected near a proposed battery storage site, compare the proposed pad and construction areas with Pennsylvania’s mine records before agreeing to a final layout. A map result is a starting point for investigation, not a finding that the ground can support a project.

Could my land work?

Locate the proposed pad in DEP’s Mine Subsidence Insurance Risk map and record whether it is in or near a known mining area or an area where coal may have been mined. Retrieve available mine sheets through the PA Mine Map Atlas and associated PHUMMIS records. Ask the developer to have qualified professionals review the records and propose a site-specific subsurface investigation before the layout and responsibilities are settled.

Compare the proposed pad with DEP’s risk map

Ask the developer for a plan showing the proposed battery pad, equipment, access roads and construction areas, and compare those locations with DEP’s Mine Subsidence Insurance Risk map. The tool can locate a site by address or coordinates. Save the location and result, and check the full proposed footprint rather than relying on a result for the property address alone.

DEP describes its gray Underground Mining Area as over or near a known mined area. Its pink Coal Exists - Possibly Mined area is over or near mineable coal where DEP does not have a record establishing whether it was mined. Neither category establishes the exact location of workings beneath the proposed pad. DEP cautions that its map information may be incomplete or inaccurate; an unmarked location does not establish that no underground workings exist.

Illustration of a land parcel and surrounding landscape

Recover the mine sheet and related records

Use the PA Mine Map Atlas to look for and download available underground coal mine maps at the site. DEP says individual maps link to records in PHUMMIS, the Pennsylvania Historic Underground Mine Map Inventory System, and Map Details opens the sheet’s information. Keep the map sheet, identifying details and linked record with the site plan, and ask DEP for help finding or interpreting available records if needed.

Show the records to the developer and its qualified professionals. Ask them to identify the mapped workings, the age and limits of the records, and uncertainties in relating the historic sheet to the current pad and access areas. A historic drawing does not by itself establish current underground conditions or the precise position of a working.

Request a site-specific investigation

Ask the developer for a written plan for a qualified geotechnical professional to review available records and recommend an appropriate subsurface investigation for the proposed footprint. Ask what areas will be investigated, what uncertainties remain, and how the results could affect the layout, foundation design, schedule and costs. The scope and conclusions depend on the actual site.

Before granting rights, discuss with your attorney who may enter and investigate the land, who pays for the work and restoration, how results will be shared, and what happens if the project must move or cannot proceed. Existing mineral and access rights also deserve review alongside the proposed agreement.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Prepare an inquiry

Sunland welcomes nationwide land and existing project inquiries. Share the property location, your relationship to it, approximate acreage if known, the proposed pad location and whether mining is mapped or suspected. Provide site plans and mine records privately if requested for review.

Questions landowners ask

Does a gray risk-map area prove a mine is directly beneath the pad?

No. DEP describes it as over or near a known mined area. Review the available mine sheets and ask qualified professionals to assess the proposed footprint.

Does the pink category mean the land was mined?

Not necessarily. DEP identifies mineable coal over or near the area but lacks a record establishing whether it was mined. Further review may be needed.

Does a blank map clear the site for construction?

No. DEP cautions that its mapping may be inaccurate or incomplete. Ask qualified professionals what records review and subsurface investigation are appropriate for the site.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Have land in Pennsylvania?Tell us about your land