California landowner guide

Can solar for off-site electricity use fit my Santa Barbara County agricultural preserve contract?

Before granting a solar option on land under an agricultural preserve contract in Santa Barbara County, ask whether the developer’s full layout could qualify as a compatible use while the contract stays in place. County rules set different limits for prime and nonprime land. The access road and other supporting facilities can change how much acreage the proposal uses.

Could my land work?

Bring the recorded contract, a map of the land it covers and the developer’s full site plan to County Planning and Development. Ask the county to confirm which land classifications and premises acreage it will use. The county’s Agricultural Preserve Advisory Committee reviews compatibility, including whether commercial agriculture can remain the principal use. Ask which zoning approvals each part of the layout needs.

Start with the recorded contract and the full layout

Get the current recorded contract, its legal description and any amendments. Ask Planning and Development to identify the contract type, the boundaries of the premises it covers and the county’s land classifications within those boundaries. If the layout crosses parcels, classifications or contracts, have the county explain how it will evaluate each part before you rely on an acreage estimate.

Ask the developer for an acreage schedule and an exhibit showing one contiguous, consolidated facility area. Rule 2-9(C)(1) counts the full footprint, including all access roads, utility poles, fences, storage buildings and other development related to or necessary for the facility. Compare the exhibit with the requested option area and flag any access or equipment that falls outside the drawings.

Illustration of a land parcel and surrounding landscape

Check the maximum acreage for the covered land

For prime land, the rule requires premises of at least 40 acres and limits the full facility footprint to the lesser of 10 percent of the premises or 10 acres. For nonprime land, it requires premises of at least 100 acres and caps the footprint at the lesser of 15 percent of the premises or 100 acres. These are ceilings applied after the applicant demonstrates compliance with the county’s commercial production and reporting requirements under Rule 1-2.3.

The adopted rule excludes solar generating electricity for off-site use on superprime land from the compatibility route. The county also identifies solar facilities as incompatible with the Williamson Act contracts for open space and recreation covered by Rules 3-3 and 4-4. Ask Planning and Development which provisions govern the recorded contract and the proposed facilities.

Show how farming can continue and the site can be restored

The contracted premises must continue to be used principally for commercial agricultural production. The layout must preserve productive land to the maximum extent feasible and avoid interference with agriculture on the property and next door. The solar facility may occupy a separate part of the premises. Show the county which fields would stay in production and how farm equipment, irrigation and access would work around the proposed facility.

The rule calls for a restoration or remediation plan with the expected lifespan of the improvements, a removal timeline and measures to recover at least the site’s prior agricultural capability. Ask the developer for this plan alongside the layout. Have counsel review who pays for removal and restoration, and what the agreement requires if a developer transfers the project or the work costs more than expected.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Tie the option to the county’s review

Ask Planning and Development what to submit for the compatibility review under Rule 2-1 and what record you will receive when the county acts. Compare the layout the county reviewed with the legal exhibit in the option. With counsel, decide which county milestones should govern exclusivity, payment deadlines and any extension if the footprint changes.

Sunland welcomes inquiries nationwide from landowners and authorized representatives about solar land sales, leases and assignments of existing agreements. Share the general location and whether a developer has proposed a layout on contracted land. Keep recorded documents, detailed site plans and signed agreements for private review.

Questions landowners ask

Does an access road count toward the acreage limit?

Yes. Rule 2-9(C)(1) includes all access roads in the facility footprint. Ask the county how it will count the route shown on the site plan, especially if it crosses a contract boundary.

Can solar and farming occupy separate areas?

Yes. The rule allows the facility to be physically separate from agriculture on the premises if the layout meets the other compatibility requirements. The contracted premises must still be used principally for commercial agriculture.

Do I need to replace the agricultural contract with a solar-use easement?

Ask the county first whether it can review the layout as a compatible use under the existing contract. Rule 6-1.3 separately addresses mutual rescission and a simultaneous solar-use easement for eligible property.

Sources & further reading

County records were checked November 22, 2026. The Board adopted Resolution 26-196 on September 1, 2026. Confirm with County Planning and Development how the contract rules and applicable zoning apply to your site. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Have land in California?Tell us about your land