What capacity should you check when a solar project adds batteries?

If a developer asks to add batteries to your solar site and says the project will keep its federal qualifying facility status, ask what that assumption means for your offer. Find out which payment, deadline or closing condition depends on it before you agree to the change.

The short answer

Ask for the project’s latest qualifying facility filing or order and an explanation of the maximum power the combined facility can deliver to the grid. In the Broadview case, the D.C. Circuit upheld federal certification based on the integrated facility’s maximum grid-usable alternating current output. Check whether the proposed project matches the facts in its own record, and ask counsel to verify any qualification the offer depends on.

Find the federal record and the deal terms that rely on it

Ask whether the developer is relying on small power production qualifying facility status under the Public Utility Regulatory Policies Act. Request the Federal Energy Regulatory Commission (FERC) docket, latest Form 556 if one was filed, and any decision or recertification that covers the facility. Ask which version of the project each record describes.

Find the proposed payment or timing provision tied to qualifying facility status, if there is one. Ask for the relevant terms of any power sale agreement the developer cites and how they relate to your rent, extension or closing. A project’s federal record and the terms of its private agreements answer separate questions.

Illustration of a land parcel and surrounding landscape

Check what the whole facility can send to the grid

Federal law ordinarily caps small power production capacity at 80 megawatts and can require counting other qualifying facilities at the same site under FERC’s rules. The size test is one part of eligibility. In the September 2025 Broadview decision, the D.C. Circuit read the applicable capacity measure as the maximum grid-usable alternating current power the facility can deliver.

Broadview’s panels and battery shared one path through inverters that physically limited the combined facility to 80 megawatts of alternating current output at any moment. The court upheld FERC’s certification for that arrangement. Ask the developer’s engineer or energy adviser to explain the actual combined facility and any separate output paths in your proposal. A battery rating in megawatt-hours describes stored energy. The capacity question concerns power in megawatts that the facility can send to the grid at one time.

Compare the existing record with the battery proposal

Ask the project team for a written comparison of the current and proposed maximum output to the grid, any utility export limit and the figures in the federal record. If an offer quotes one capacity number, ask what it measures. If a limit appears in a utility agreement, ask the adviser to explain how it relates to the facility’s actual capability and the federal capacity test.

If the proposed configuration differs from the federal record, ask counsel whether the existing status can be relied on and what confirmation or updated filing the project needs. Agree which party will provide that evidence and when. If rent, an option extension or a sale depends on a qualifying facility assumption, ask what the land agreement says should happen if that assumption changes.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Discuss your property or existing agreement

Sunland welcomes inquiries from owners and authorized representatives nationwide about selling or leasing battery storage property or assigning an existing agreement. Share the general property location, your role and the transaction you are considering. Keep signed agreements, private project exhibits and commercial records out of the initial inquiry.

Questions landowners ask

Does the battery’s megawatt-hour rating establish the facility’s capacity?

Megawatt-hours describe an amount of energy. For the capacity question, ask how much power the facility can deliver to the grid at any one time and have counsel confirm how FERC’s rules apply to the specific facility.

Can I use an earlier qualifying facility filing for an expanded project?

Ask for the current filing and compare its facts with the proposal. Have energy counsel determine whether the developer can rely on the existing record or needs an update before relying on qualifying facility status.

What if the developer says the utility agreement already caps exports?

Ask the adviser to explain the utility limit, the facility’s maximum capability and the basis for the capacity in the federal record. The Broadview court considered a physical limit on what the combined facility could deliver.

Sources & further reading

Federal law, FERC rules and the September 2025 D.C. Circuit opinion on remand checked November 21, 2026. Local rules and program details can change. Check the requirements for the actual project.