Compare the field map with the project
Obtain the producer’s current acreage report and farm and tract maps, plus a layout identifying the proposed panels, equipment, roads and construction areas. Compare them field by field and mark which land will remain in production, which may change use and which boundaries are uncertain. Update the comparison when the actual project differs from the proposal.
Farmers.gov says producers with an account can view and export current and prior acreage reports and farm and tract maps. The local FSA office can provide maps and reporting deadlines. Coordinate with the operator or tenant who reports the acreage; ownership and the person filing the report may differ.

Ask FSA about the actual change
USDA says accurate and timely acreage reports are required for eligibility for many programs, and deadlines vary by crop, state and county. FSA uses the FSA-578 acreage report; required information includes crop, intended use, acres, map boundaries and producer shares. Ask the local office what to report, what documents it needs and the applicable deadline for this farm.
A February 2019 Rhode Island FSA newsletter told producers with solar panels constructed on their farms to notify the local FSA office and described designating areas no longer suitable as cropland in FSA records and maps. That historical local newsletter is a reason to ask the current local office, not a substitute for its present instructions or a determination for another farm.
Separate reporting from program effects
Federal rules require a corresponding reduction in total farm base acres when base acres are converted to non-agricultural commercial or industrial use. Do not calculate a reduction from the solar lease acreage alone. Ask FSA to explain any current program-specific effect using the farm’s records, the actual use and timing; ask separately about any conservation contract or loan.
If crops are insured, contact the insurance agent too. USDA says common report information may be shared electronically, but producers must still contact both FSA and their agent to complete program-specific information, validate information, complete maps and sign reports. Ask each which changes and dates it needs.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPlan responsibilities before signing
Discuss who will provide updated drawings, notify the producer of construction changes and bear costs or losses addressed in the agreement. Keep a record of the questions and the office’s response. Have independent counsel review the proposed sale or lease, including access, acreage, timing and assignment provisions, before signing.
Sunland reviews solar property opportunities nationwide, including potential sales and leases and existing project agreements. An owner or authorized representative can share the property location, approximate acreage, relationship to the property and known project stage. Provide farm records privately if requested.
Questions landowners ask
Does signing a solar option automatically change the acreage report?
The actual land use and applicable reporting rules matter. Ask the local FSA office when and how a proposed or completed change should be reported.
Who should contact FSA?
The producer responsible for the acreage report should coordinate with the local office. An owner and tenant may need to share maps and project updates.
Does the solar footprint always equal lost program payments?
No. Ask FSA about the current rules and the specific farm and programs; lease boundaries alone do not establish the result.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.