Landowner guide

How can an excess-land covenant affect a solar land sale?

If your title or Reclamation records show that proposed solar land is excess or carries an unexpired excess-land deed covenant, investigate before signing an option or agreeing on a sale price. The history can affect whether the land remains eligible for federal project irrigation water and how a sale is valued.

The short answer

Ask the district and Reclamation to identify the land’s actual designation, any deed covenant or recordable contract, and the approval needed for the proposed transfer. When price approval applies, a sale without it can leave the land ineligible for Reclamation irrigation water. A previously signed option affecting the property can also set the appraisal date under 43 CFR 426.13(d), so seek advice before signing.

Identify the record that applies to your acres

Excess status is tied to federal reclamation acreage limitations and is not a label for every farm served by a district. Reclamation explains that an excess designation binds the land. It may continue to matter to a buyer even if the buyer owns less than its own entitlement. Excess land is generally ineligible for Reclamation irrigation water unless a specific exception applies.

Obtain the legal descriptions and title history, designation records such as Form 7-21XS, any approved-sale file, deeds and recorded covenants, and any recordable contract and amendments. Compare the proposed solar footprint and retained acres with those records. Ask the district and Reclamation RRA staff for the current designation and water eligibility, and whether a covenant or contract applies. A routine annual landholding form alone does not resolve the sale-price or disposal questions.

A new designation form does not by itself accomplish an ordinary redesignation. The regulations have limited exceptions to the approval requirement; otherwise Reclamation approval is needed. Stopping irrigation or planning panels does not itself release a designation or covenant. Review the actual records before making promises about future use.

Illustration of a land parcel and surrounding landscape

Separate a deed covenant from excess designation

Land transferred from excess to nonexcess status may carry a covenant running with the land. Under section 426.12(i), the covenant generally expires ten years after the first transfer from excess to nonexcess status, not ten years after each resale. Find the original transfer date and the expiration stated in the deed; ask Reclamation and counsel to confirm the applicable period and any exception.

During an applicable covenant period, a voluntary resale generally requires Reclamation price approval for continued irrigation eligibility. The buyer must also have available ownership entitlement and satisfy applicable requirements. For example, a resale in year six does not start a fresh ten-year period, but the approval question remains for that resale. Certain involuntary conveyances have special rules; have the agency review the actual chain of title rather than assuming an exception applies.

When the covenant expires, the rule permits resale at fair market value, subject to other applicable acreage and eligibility rules. Expiration alone does not promise a future water supply or erase all restrictions on the buyer’s landholding.

Discuss price approval before the option

Where price approval applies, Reclamation’s appraisal uses fair market value without reference to construction of the irrigation works. It also assesses the contributory value of improvements and considers appropriate nonproject water supply factors. This is not simply a preset agricultural-acreage price, nor is a developer’s offer itself an approved value. Provide information on improvements, other water supplies and the proposed property to Reclamation.

Section 426.13(d) normally uses the appraiser’s last inspection date, but a prior signed instrument affecting the property, such as an option or sale agreement, makes that instrument’s date the appraisal date. A multi-year solar option can therefore matter well before closing. Ask Reclamation and your attorney how the proposed document affects valuation, timing and the price-approval process before signing. The applicable rule also provides an exception where its procedures would conflict with certain pertinent contracts in force on October 12, 1982; supply any historical documents for review.

Reclamation selects a qualified appraiser and reviews the appraisal. The regulations address initial appraisal costs, reappraisal and a panel procedure if the requesting owner disagrees. Ask who will pay which costs and how long the agency expects the review to take. Build a realistic approval condition and schedule into the transaction rather than relying on an informal estimate.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Understand the water consequence of an unapproved sale

If land subject to price approval is acquired without it, section 426.12(f) makes the land ineligible for irrigation water until the specified corrective conditions are met. The rule identifies price reformation to the approved price with eligibility within the owner’s entitlement, or a sale to an eligible buyer at an approved price. Discuss any proposed corrective agreement with Reclamation and counsel; do not assume a later filing automatically cures the issue.

A solar buyer may not plan to irrigate immediately, but the future use and value of retained or resold land can depend on eligibility. Price approval is not a guarantee of future water delivery: confirm district service, the buyer’s entitlement and other applicable conditions separately. Reclamation’s fact sheet says the seller must tell the buyer of an excess designation and the buyer should determine whether the land has ever been designated excess.

Check for an existing recordable contract

A recordable contract is a separate instrument, and Reclamation describes it as rare in the current context. Where one exists, read its land description, amendments and maturity date with Reclamation and counsel. The regulation requires an agreement to dispose of the excess land to an eligible buyer and a power of attorney for Reclamation to sell if the owner has not sold by maturity.

The ordinary regulatory disposition period is within five years from Reclamation’s execution of the contract; for the Central Arizona Project it is ten years from the date water becomes available to the land. These are recordable-contract clocks, distinct from the deed covenant’s ten years from the first excess-to-nonexcess transfer. Check the signed instrument and applicable law, including any amendment, rather than calculating a deadline from the date of a solar option.

If the owner does not dispose of contract land within the specified period, section 426.12(j) provides for Reclamation to sell it, subject to the rule’s provision for an owner who timely completes the sale requirements. A solar lease alone should not be assumed to satisfy a duty to dispose. Contact Reclamation promptly if a contract may be near maturity; review the transaction and any request to amend the contract before relying on more time.

Coordinate the sale and retained land

Give your attorney, title company, district and Reclamation the proposed option, purchase agreement, legal descriptions, map and expected dates. Ask which parcels need approval, whether the buyer has sufficient entitlement, what appraisal and deed language are required, and how the closing should handle denial or delay. A partial sale can leave different designations and water questions on the retained land; map them separately.

If considering a lease or an assignment instead, show the actual documents to counsel and Reclamation, especially where a recordable contract or retained interest is involved. Neither a lease nor an assignment automatically clears an existing covenant or obtains a required approval. Related lender, district and access requirements may need separate review.

Sunland welcomes solar land sale, lease and existing agreement inquiries nationwide. Depending on the transaction and its terms, Sunland may contract with an owner and assign the contract to a specialist. Share the location, approximate acreage and proposed transaction; provide deeds and sensitive records privately when requested.

Questions landowners ask

Does every solar sale on a Reclamation project need price approval?

No. The actual excess status, applicable deed covenant, transaction and exceptions matter. Ask Reclamation to review the property history and whether approval is needed for irrigation eligibility.

Does a solar option affect the appraisal?

It can. Under section 426.13(d), a prior signed option or other listed instrument affecting the property sets the appraisal date at the instrument date. Discuss the draft and its timing with Reclamation and counsel before signing.

Can a solar lease satisfy a recordable contract?

Do not assume it does. An existing recordable contract contains a disposal obligation; provide the actual contract and proposed lease to Reclamation and counsel to determine the consequences and deadline.

Sources & further reading

The current regulations and Reclamation’s January 2026 fact sheet were checked November 18, 2026. Status, eligibility and applicable requirements depend on the land and its records. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land