Compare the sale boundary with farm records
Obtain the current FSA farm and tract numbers, maps and available base-acre information. Ask the buyer for a survey or proposed legal description showing the land to be sold, access and any land retained. Compare it with FSA field and tract boundaries; a tax parcel or project sketch is not necessarily the same as an FSA tract.
Bring ownership documents, the proposed sale description and relevant farm program records to the county FSA office. If a tenant or another owner participates in the operation, ask FSA who should be involved and what documentation or signatures are needed. A proposed boundary may change before closing, so update the office if it does.

Ask how a division would be handled
FSA describes reconstitution as combining or dividing farms or tracts based on the farming operation. Federal regulations set conditions for farm constitution and reconstitution; the county office can explain how they apply to the actual sale and operation. A sale drawing alone does not establish the resulting FSA records.
Ask about the applicable base-acre division methods, required signatures and records. Under 7 CFR 718.206, a landowner using the designation method must file a written memorandum of understanding signed by the transferring owner and transferee with the county committee before ownership transfers. Ask FSA about the method’s other conditions, including rules for land held less than three years. The method and result depend on the transaction and FSA review.
Resolve open questions before signing
Ask FSA about the separate FSA-155 reconstitution request, required signatures and supporting ownership documents, and how the proposed division and change in land use could affect your specific programs, records, deadlines and future reporting. Confirm what can be decided before a sale and what must wait for signed or recorded ownership documents. Ask for the current requirements rather than relying on an old deadline.
Discuss the answers with your buyer, farm operator and advisers. Have counsel review the sale description and any agreement about program records or cooperation. A private agreement cannot substitute for FSA’s determination under applicable rules.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSubmit the property for review
Sunland welcomes solar land and existing project inquiries nationwide. Share the location, approximate acreage if known, your relationship to the property and the portion you are considering selling. Mention that FSA farm records may need review; provide maps or program documents privately if requested.
Questions landowners ask
Do base acres automatically stay on my retained land?
Do not assume that result. Ask your county FSA office which division methods and conditions apply to the actual sale and who must sign.
Is an FSA tract the same as a tax parcel?
Not necessarily. Compare current FSA maps and tract records with the proposed surveyed sale boundary.
Should I wait until closing to contact FSA?
An early conversation can identify records, signatures and timing questions before the agreement is final. Ask FSA what it can review before closing and what documentation must follow.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.