Identify the operator and the lease that applies
Find the signed lease, amendments and any assignment that identifies the current operator. Texas Utilities Code Chapter 302 applies to a covered solar power facility that is a generation asset and defines the grantee as a party other than an electric utility that leases the property and operates the facility. Ask counsel to check those definitions and equipment ownership for your project.
Texas first applied Chapter 302 to agreements entered into on or after September 1, 2021. The 2025 amendments, including the panel reuse and recycling provisions, apply to agreements entered into on or after September 1, 2025. Earlier agreements follow the law preserved by the relevant enactment. Have counsel review the original signing date and the effect of any later amendment, extension or assignment before relying on a particular version.

Ask the operator to account for each load
Section 302.0004(a-1) requires a covered lease to make the grantee responsible for collecting and reusing or recycling, or shipping for reuse or recycling, all components that can practicably be reused or recycled, including photovoltaic modules. The lease must provide for lawful disposal of the other components. Ask the operator and qualified waste professionals how they classified those components and confirmed that each proposed disposal facility can accept that material under applicable state and federal law.
Start with the removal inventory and match it to shipment and receiving records using a batch or load identifier. Ask which quantities were received, where they went and whether any were returned, redirected or are awaiting further processing. A weight ticket and an inventory count may use different units. Ask the operator to reconcile them so you can identify any unaccounted equipment. The records below are examples to request or address in the lease.
| Stage | Records to request |
|---|---|
| Removal | Component inventory by batch and count or weight, including damaged equipment and material still on site. |
| Shipment and receipt | Bill of lading or equivalent shipping record, destination and dated record of the quantity accepted. |
| Reuse, recycling or disposal | Receiving facility’s disposition record, or an update on accepted material awaiting processing, as agreed in the lease. |
| Rejected or redirected load | Return or transfer record, current location, responsible party and follow-up receipt or status. |
Check what a recycler’s listing establishes
The Texas Commission on Environmental Quality lists Texas renewable-energy component recycling facilities that have submitted the required annual report. Those reports account for unrecycled components the facility has accepted, including material under its control at another location. Texas’s recordkeeping rule for covered recycling facilities includes shipping and disposal documents and records of quantities recycled. Ask the operator for records tied to your project to confirm whether a specific load was accepted or processed.
Suppose the same truck hauls intact and damaged panels, and the receiving facility accepts only the intact batch. Match its receipt to the original count and ask who took the rejected batch, where it is being held and what record will confirm its next destination. Ask the operator’s waste professional about the classification and lawful destination of the damaged material. If a different facility ultimately receives it, match that receipt to the original batch as well.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landLink the paperwork to handback and financial assurance
If you are negotiating the lease, have counsel address who supplies the closeout records, their due dates, the process for resolving missing records, and which documents you need before signing a handback acknowledgment. For an existing lease, review what the operator owes under the agreement and what signing the proposed acknowledgment would confirm or release. Track ground restoration and any remaining access separately from the equipment records.
For agreements covered by the 2025 amendments, §302.0005 includes recycling or disposal in the independent Texas-licensed engineer’s cost estimate used for decommissioning financial assurance. Review whether the estimate reflects the proposed handling of the equipment. Texas also requires the grantee’s existing security to remain in place on a covered facility ownership transfer until the landowner receives evidence of financial security that meets the chapter’s requirements. Ask counsel to compare the current instrument and any planned release with the lease and outstanding work.
Discuss a solar lease or land sale
Sunland welcomes nationwide inquiries from landowners and authorized representatives about sales, leases and assignments of existing solar agreements. Share the general location and whether you are negotiating a lease or preparing for handback. Keep signed agreements and shipment records for private review.
Questions landowners ask
Does my older lease have to include the 2025 recycling provisions?
The 2025 amendments apply to covered agreements entered into on or after September 1, 2025. Review the original lease and later documents with Texas counsel to determine which law and terms apply.
Does a hauling receipt show the recycler accepted the panels?
Ask for the receiving facility’s record and match its accepted quantities and date to the shipping document. Check the status of any load the facility returned, redirected or still holds.
What can I ask for while negotiating the lease?
Discuss an inventory, dated shipment and receipt records, updates on unresolved loads, and what evidence the operator will provide before you sign any restoration or handback acknowledgment.
Sources & further reading
Texas statutes, enrolled bills and agency guidance were checked November 20, 2026. Confirm the applicable lease version and project records with the relevant parties and advisers. Local rules and program details can change. Check the requirements for the actual project.
- Texas Utilities Code, Chapter 302
- Texas Legislature, enrolled 2025 HB 3228
- Texas Legislature, enrolled 2021 SB 760
- TCEQ, renewable energy component recycling reporting
- TCEQ, adopted recycling facility rules including 30 TAC §328.451
- TCEQ, Requirements for Renewables Energy Component Recycling Facilities
- U.S. EPA, End-of-Life Solar Panels: Regulations and Management