Gather the septic records
Request the property’s septic records from your local health department, including permits, inspection reports, any as-built drawing and documents showing a reserve or replacement area. VDH explains that permits describe the system and its proposed components, while an as-built drawing shows important components as installed. An as-built may not be available for an older system.
Also collect your survey, deed and any septic easements or maintenance records. Ask the health department what is known about the drainfield and any designated reserve area, what the records do not show, and whether more documentation is available. A missing sketch does not establish that an area is free for construction.

Put the septic sketch beside the project plan
Ask the developer for a plan showing the battery pad, equipment, access roads, buried lines, staging areas and construction vehicle routes. Compare it with the septic sketch and property boundaries. Include the tank, pipes, drainfield and any identified reserve or replacement area, along with access needed for pumping, maintenance or repair.
A sketch or preliminary project drawing may not accurately locate every feature on the ground. If there is a possible overlap or uncertainty, ask a qualified onsite professional how to locate the system and reconcile the records with the proposed work. Do not treat a visual comparison as permission to build or drive over an area.
Ask the health department about the specific site
Take both plans to the local health department and explain that the farmhouse remains occupied. Ask whether a reserve area is documented or required for this system, how the proposed work could affect it, and what review or additional information is needed. Virginia’s sewage regulations require reserve areas under specified conditions and address their identification on certain subdivision plats when required. Ask how the rules and the property’s records apply to this system; there is no single setback in this guide for every property.
If the proposed route or pad conflicts with the system or a needed area, ask the developer to show an alternative and explain how household service and future maintenance access will be protected. Discuss the actual agreement with your attorney, including investigation costs, restoration, damage responsibility and what happens if the layout must change.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPrepare an inquiry
Sunland welcomes nationwide land and existing project inquiries. Share the property location, your relationship to it, approximate acreage if known, and whether an onsite system or replacement area is near the proposed project. Provide plans and septic records privately if requested for review.
Questions landowners ask
Where can I find my septic system records?
VDH says septic records are available from the local health department upon request. Ask for permits, inspection reports and any as-built drawing or reserve-area records.
Does every Virginia property have the same required septic reserve area?
No single rule should be assumed for every property. The regulations address reserve areas under specified conditions; ask the local health department about your system and records.
Can the developer use a replacement area for access?
That depends on the site, records and applicable review. Show the proposed route to the local health department and a qualified onsite professional before agreeing to it.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.