Identify the land and the proposed use
Include the county or city and a road or street address. A parcel number is helpful for undeveloped land. Describe how the land is used today and whether all or only part could be considered.
If access depends on crossing another property, mention it. A visible track is not enough to explain the rights to use it. Share any written access records you have rather than assuming they cover construction or project vehicles.

Tell us if the land already has a solar approval
Virginia Code § 15.2-2316.10 provides an accessory-use route for qualifying batteries within an approved solar parcel, subject to its capacity test. It removes further local land-use approval for qualifying additions, while retaining applicable safety, fire and environmental requirements. It is not a general permission for standalone storage.
If your property has a solar approval or agreement, include that fact in the inquiry. Ask the project team to check the approved boundary, proposed design, existing land rights and electrical arrangements. An approval route does not itself give a developer permission to use your property or settle a new payment.
Reference: Virginia Code: battery additions to approved solar projects
Know which reviews are being discussed
Virginia DEQ publishes energy storage permit-by-rule resources for facilities within its program. The resources distinguish project categories and provide different checklists. DEQ also notes that other permits may be needed.
Ask the developer to identify the applicable DEQ, local and State Corporation Commission review steps for the proposal. The utility connection is another part of the review. Do not treat a single filing or authorization as proof that all of these issues are settled.
Reference: Virginia DEQ: energy storage permit-by-rule resources · Virginia SCC: utility regulation
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landRead what a signed utility document actually confirms
If a developer says the utility has signed off, ask for the document and the drawing it covers. Read the sentence beside the signature. Is it acknowledging an application, approving installation, setting conditions, or allowing the completed system to operate?
Southside Electric’s posted net-metering notification provides a concrete example. The form, labeled effective March 1, 2020, says the utility representative’s signature signifies receipt. It also separates the initial information submitted before installation from the electrician’s certification after installation. A signature on that receipt should not be described as permission to operate.
The form asks whether there is battery backup, but it is a net-metering notification. That checkbox does not establish the connection route for a standalone battery on leased land. Ask the developer for the utility’s response to the actual proposed use, including charging and export.
Compare the record with your option or lease. Which event starts rent, and what document will show that event occurred? If the team has only an application receipt, ask what payments you receive while the remaining work continues and when the reserved land can be released.
Reference: Southside Electric: posted net-metering notification, effective March 1, 2020
Ask what happens between installation approval and operation
Southside’s current solar FAQ describes approval before installation, local inspection, a utility site inspection and agreement, followed by written permission to operate. That sequence is solar guidance, not a promise that every battery project uses the same process. Its value for an owner is the distinction between the stages.
Request a short list for your project: the approval already received, the next inspection or agreement, the party responsible and any condition still outstanding. Keep the list beside a dated site plan. If someone changes the equipment or connection point, ask whether the earlier response still covers the design.
Southside also explains that home battery backup may supply selected circuits with suitable equipment. A battery leased to serve the grid does not, from that description alone, provide backup to your house or business. If backup is part of the offer, ask which circuits would be supplied, who would install and maintain that arrangement, and where the promise appears in writing.
You can inquire with Sunland before collecting utility documents. Share the property location and say whether a battery is proposed for an existing building, vacant land or an existing solar site. If you have received an offer, describe what the company says is approved and what you still want explained.
Reference: Southside Electric: solar, battery backup and installation approval steps
Describe slopes, water and access early
Tell us about steep areas, streams, wet ground and the road entrance if you know them. You do not need an engineering report to begin. These details help focus a later site review on the area that could actually be used.
Ask for the proposed equipment area, drainage plan and access route on a drawing. If you have homes, farm uses or commercial activity nearby, include them in the discussion before agreeing to reserve the land.
Ask what happens during an option period
An option gives the developer time to investigate the property. Ask what work it can do, who repairs any damage and how long the period can continue. Find out whether extensions require your agreement or are already included in the document.
Ask when operating payments would begin and what happens if the project is not approved or cannot connect at an acceptable cost. If the agreement affects a larger area while the layout is being studied, ask when unused land would be released.
Send what you already know
Start with the property location and contact details. Optional information includes acreage, parcel number, lease or sale preference and a note about access. You do not need to identify the proposed equipment or calculate a project’s output.
If your main question is whether a certain part could work, describe that part. Sunland may follow up for a map and other information. Further site and project checks are needed before an agreement or construction decision.
Questions landowners ask
Does DEQ authorization replace every other approval?
No. Ask which other local, utility and state requirements apply to the proposal. DEQ’s materials note that additional permits may be needed.
Does a signed utility form mean the battery may operate?
Read what the signature confirms. Southside’s posted net-metering form identifies its utility signature as receipt; its solar guidance describes a later written permission to operate. Request the approval record for the actual battery proposal.
Can I ask about land with no street address?
Yes. Include the nearby road, county or city, and a parcel number if available. A description of the entrance is useful too.
Should I clear or grade land before asking?
You do not need to alter the property to submit an inquiry. Start with its current condition; any proposed work needs its own plan and review.
Sources & further reading
Southside Electric’s solar guidance and linked net-metering notification reviewed October 7, 2026. The posted form is labeled effective March 1, 2020. These examples do not establish a standalone-battery connection route or update the review dates of the guide’s other sources. Local rules and program details can change. Check the requirements for the actual project.