Use the right local name when describing the land
Include the county and the town, village or city where the parcel is located. A mailing address may not identify the authority responsible for the land. If your tax record names a different municipality, include that too.
Share a parcel number or map if you have one. For a large property, describe the area you could offer and how vehicles would reach it. Mention any buildings, homes or areas you plan to keep using.

What a utility hosting-capacity map tells you
The New York Joint Utilities publish storage hosting-capacity maps. These are estimates of how much equipment the system may accommodate under the assumptions used for the map. They help identify places to investigate; they do not reserve capacity for a project.
A battery both draws electricity to charge and sends electricity back. A proposed connection needs to account for both. If you have saved a utility map, include the utility name and the date rather than treating a map color as a project approval.
Reference: New York Joint Utilities: storage hosting capacity
Check the actual local requirements
NYSERDA’s battery storage guidebook includes model rules and permitting resources. A model rule is a reference for communities, not proof of what your town has adopted. The local authority still needs to review the actual proposal.
Ask which local battery rules apply and which drawings or reviews would be needed. Do not assume a neighboring town’s decision settles the question for your parcel. The project layout, equipment and surroundings can lead to different questions.
Reference: NYSERDA: battery storage siting guidebook
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKeep your plans for the rest of the property visible
If you farm the land, describe how you reach the remaining fields. If you have a commercial property, mention parking, deliveries and future building plans. A small equipment area can still affect a driveway or utility route elsewhere on the parcel.
Before signing an option, ask for a map of the reserved area and any access rights. If the final layout has not been chosen, ask how it will be narrowed down and when land that is not needed would be released.
Prepare a short property note
You can begin with the address or road, municipality, county and your contact details. Add acreage and the utility name if known. You do not need to calculate megawatts or know which equipment could be installed.
Tell us whether you are considering a lease, sale or both. Sunland may follow up for a map or other information. Further connection, layout and approval work would be needed before anyone can say a project is ready.
Questions landowners ask
Does a favorable utility map mean my land qualifies?
No. Maps are an early research tool. The actual connection, costs and approvals still need to be checked.
Does the NYSERDA model law apply automatically?
No. Check the rules adopted by the authority responsible for your parcel. The model law is a reference, not a parcel-specific approval.
Should I know the project size before contacting you?
No. Share the land location and the area you could make available. Project sizing can be investigated later.
Sources & further reading
Sources checked 2026-10-03. Local rules and program details can change. Check the requirements for the actual project.