Describe the project before applying the solar law
The filed 2024 law regulates solar energy systems. Section 10(N) adds conditions when a proposed utility-scale solar farm includes an on-site battery energy storage system. A proposal for batteries alone needs its own explanation of the local route.
Ask whether the company wants batteries only, solar and batteries together, or a reservation that could later cover either. Request a drawing showing the proposed land use. If the company plans to decide later, ask which rights it wants from you while that decision remains open.
Have the responsible Town office confirm the classification and current requirements for the actual design. Request the record behind any claim that permission has already been obtained. A solar approval or a reference to battery conditions does not establish approval for every storage proposal.
This page concerns the Town of Sandy Creek in Oswego County. It does not establish the Village of Sandy Creek’s or Village of Lacona’s battery rules. Confirm the installation’s jurisdiction; a mailing address or shared regional board does not make all local requirements identical.
Reference: Town of Sandy Creek: filed Local Law 2 of 2024, including solar-farm battery requirements · Town of Sandy Creek: regional Planning Board and records · Town of Sandy Creek: Code Enforcement

Ask who takes responsibility for battery operation
For the solar-farm battery described in the law, the operator has duties involving system monitoring, responder training and information, emergency access and incident expenses. Ask which company would perform those duties and whether it is the company signing the land agreement.
Request an explanation of the safety design from the project team. Have it identify the equipment, monitoring arrangements and approvals it must obtain. The landowner should understand the responsibilities without being expected to design or operate the safety systems.
Ask how the local fire department would receive the required training, information and access. Who would keep contacts current? How would the operator coordinate a problem at the site and notify you? Request a dependable contact arrangement that continues after construction.
Discuss a project transfer before signing. If a different company becomes the operator, how would it assume the site duties and payment obligations? Have the agreement explain notification, continuing responsibility and what happens if the operator fails to perform.
Reference: Town of Sandy Creek: filed Local Law 2 of 2024, including solar-farm battery requirements
Show emergency access and winter maintenance on the plan
The solar-farm battery conditions address fire-department gate access, unobstructed access in snow and adequate routes for response vehicles. Ask the project team to show the route and required space on the same plan as the equipment and fencing.
Could that route interfere with your driveway, crops, rented land or a business entrance? Identify the areas you need to keep available. Ask how construction traffic and later visits would use them, and which parts of the property would be restricted permanently.
Request responsibility for maintaining the route, plowing snow and repairing damage. If the company expects to share your existing access, ask who coordinates upkeep and who pays. Do not assume that the fenced equipment footprint describes all the land rights it needs.
If access or electrical lines would cross another property, ask who would obtain those rights. A drawing of the intended route is not evidence that a neighbor has agreed. Your agreement should explain what happens if a necessary off-site route cannot be secured.
Reference: Town of Sandy Creek: filed Local Law 2 of 2024, including solar-farm battery requirements
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSeparate local review from a utility opportunity
If the proposal mentions East Pulaski or another grid-service target, ask how your parcel relates to the actual electrical circuit. Request the proposed connection location and route. Being in a named town does not establish that the property can serve the required line.
Ask which utility applications or studies exist and what remains unresolved. Who pays for studies, design and upgrades? Could a connection decision change the land area or equipment? Request separate explanations of confirmed decisions and preliminary assumptions.
Keep the land-use review visible alongside the utility timetable. A utility request does not answer whether the Town can approve the proposed use. Ask what happens to your reservation if either track stops or takes longer than expected.
For a combined solar-and-battery proposal, ask which parts depend on each other. If the solar portion does not proceed, would the company seek a battery-only use? What local review and owner consent would that change require?
Discuss incident cleanup and eventual removal before rent
The solar-farm battery conditions place post-fire remediation and disposal expenses on the facility operator. Ask how the land agreement addresses those responsibilities, insurance and a situation in which the operator cannot pay.
Keep incident cleanup separate from ordinary end-of-project removal. Request terms covering damaged equipment, an unsuccessful development, discontinued operation and the end of the agreement. Who performs the work, who pays and what condition would the land be left in?
The solar law also includes decommissioning and abandonment provisions. Ask the Town which requirements it would apply to the actual proposal, particularly if storage and generation could operate or stop at different times. Do not assume a solar-generation deadline settles every battery-removal question.
Compare those obligations with the proposed option payments, rent and reservation term. Ask when operating rent begins, what you receive during delays and when the company must release the property. Have your advisers review the actual documents and responsibilities before committing.
Reference: Town of Sandy Creek: filed Local Law 2 of 2024, including solar-farm battery requirements
Tell Sunland what is being proposed
Start with your name, email and phone number, then the property location, Oswego County and New York. Acreage and parcel references are optional. Correct the location fields if the land is in another jurisdiction.
Tell us whether you are asking about batteries alone, a combined solar-and-battery offer or your land before receiving an offer. Describe the property’s current use, access and any areas you want to keep available. You do not need a completed project design.
Submitting the form starts an inquiry. It does not reserve land, submit a permit application or establish that a project is allowed. Further discussion would need the actual parcel, current local route, connection questions and proposed terms.
Questions landowners ask
Does the solar law mention battery storage?
Yes. Section 10(N) sets conditions for an on-site battery at a proposed utility-scale solar farm.
Does that establish permission for a standalone battery?
No. Ask the Town to confirm the classification and review requirements for the actual standalone proposal.
Who would handle responder training and post-fire cleanup?
The filed solar-farm battery conditions assign duties to the operator. Ask which company would perform them and how the agreement addresses costs and a transfer.
Does a shared Planning Board mean the village rules are identical?
No. Identify which municipality governs the installation and obtain its applicable requirements.
Does being near a utility target make my land eligible?
No. Ask for the parcel’s proposed electrical route and separate local and utility review.
Can I ask about my land without an acreage figure?
Yes. Contact details and the property location are the starting point. Acreage and parcel references are optional.
Sources & further reading
Sources checked 2026-10-05. Local rules and program details can change. Check the requirements for the actual project.