Begin with the jurisdiction and zoning
Give the parcel number and say whether you know the property is governed by town or village rules. A Southampton postal address does not settle that question. Ask the responsible office to confirm the zoning district and the proposed use before estimating a development timeline.
The town’s storage article was added in June 2025. Its Tier Two provisions identify LI-40 and LI-200 light-industrial districts and a five-MW upper limit. These are important local limits, not a general rule for Long Island. Ask which classification the actual design falls under.
Reference: Town of Southampton: adopted battery energy storage article

Do not treat an industrial label as the whole answer
The same article lists avoidance areas, including residential proximity, wetlands, flood-hazard areas and agricultural or protected land. A site needs more than the right district name. Have the developer show which limitations affect the equipment and the rest of the layout.
If someone presents a drawing with only a fence and acreage, request the property lines, nearby uses, entrance and cable route. Identify parking, tenant space and future expansion you want to retain. The useful question is whether the whole arrangement works on this particular parcel.
Reference: Town of Southampton: adopted battery energy storage article
Keep capacity terms clear
Ask the developer to state the proposed battery’s power and energy ratings separately and explain the classification used in its application. Power describes the rate of delivery; energy describes how much can be stored. A rating without units makes a proposal difficult to compare.
You do not need to select those ratings yourself. You do need to understand whether the proposal is a small system serving an existing building or a larger site primarily serving the grid. Have the reviewing office confirm how the current town provisions apply.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAn occupied property needs a retained-use plan
For a commercial or industrial site, list the activities that must continue: deliveries, customer access, outdoor storage and tenant operations. Ask whether the project affects the existing electric account or requires a separate connection.
If construction would use your main entrance, ask how it would be managed and who restores affected surfaces. Identify any neighbor or tenant rights that cannot be changed by your agreement alone. These questions belong in the first discussion, before a final site layout is presented.
Ask what is still unresolved
Have the developer distinguish town review from utility connection work. Ask for any application references and explain which studies, approvals and costs remain uncertain. A favorable utility screen does not override the town’s siting limits.
When an option is proposed, ask how long the property is reserved and what happens if the design cannot meet the rules. Send Sunland the location, current use and available records if you want an initial discussion. An inquiry does not grant approval or reserve your land.
Questions landowners ask
Can any vacant Southampton parcel host a larger battery project?
No. The town article restricts Tier Two locations and lists avoidance areas. The actual jurisdiction, district and layout need review.
Does the town article apply automatically inside a village?
Confirm the authority for the parcel. A mailing address alone is not enough.
Should I choose a battery size before inquiring?
No. Provide the property information you know and any proposal already received.
Sources & further reading
Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.