Discuss the end of the project at the start
Brookhaven’s published section 85-816 requires a battery removal plan and a financial guarantee before a building permit. Section 85-817 provides for action when construction stalls or operations stop, including restoration costs that may become a lien and tax against the property.
Ask the developer to explain how it would meet the applicable public requirements and how your private agreement would address the same work. Which company pays, which documents make that obligation enforceable, and who responds if a notice arrives?
Do not leave this conversation until the end of the lease. Discuss what happens after the planned term, if the project never starts, if construction stops midway or if the operator leaves. Ask for clear responsibilities for each situation.
A promise to take away the batteries is not a complete description of restoration. Ask what happens to equipment pads, foundations, cables, fences, access roads and drainage works. Identify what you want removed and what, if anything, you would want to retain.
Reference: Town of Brookhaven: battery locations, plans and restoration provisions

Confirm which authority and battery classification apply
The published town article distinguishes system tiers and locations, with different routes for listed business and industrial districts. Those provisions are a starting point for a parcel-specific answer, not blanket permission for every property with a Brookhaven mailing address.
Have the team identify the actual municipality, zoning district and proposed system classification. Ask the reviewing authority which current requirements and application route apply. If the property is in an incorporated village, establish the responsible authority before applying town provisions to it.
Ask which approvals cover the equipment, site work and connection. Which decisions are final, which applications are pending, and what conditions remain? Compare the current plan with those decisions rather than relying on a presentation or an older design.
If a solar approval is being used to support a battery addition, ask where storage is addressed. Do the approved drawings and private rights cover the proposed battery, access and connection? The town article contains separate solar and battery provisions; the developer should explain the actual applicability.
Reference: Town of Brookhaven: battery locations, plans and restoration provisions
Find out what the financial guarantee actually covers
Request an explanation of the proposed bond or other guarantee. Who provides it, who can call on it, when does it start and when can it be released? Ask your adviser to compare those answers with the obligations in the agreement you would sign.
Ask what costs the estimate includes. Does it cover equipment removal, below-ground work, disposal, restoration and access for contractors? What assumptions are made about equipment resale or salvage, and what happens if those values are lower than expected?
Find out whether estimates and security would be reviewed as the equipment, costs or project ownership change. Ask who pays for any replacement or increase and what happens if the guarantee lapses. Discuss how you would learn about a change affecting your protection.
Ask separately about your own costs. Would the agreement cover unpaid rent, property damage, adviser fees or lost use during restoration? A guarantee provided to a public authority should not be assumed to cover every private loss you could face.
For example, a project might stop while equipment remains on a corner of a working property. Ask who keeps it secure, who maintains the access and when the area becomes usable again. Compare the answer with the documents rather than relying only on a stated equipment lifetime.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAgree on the condition in which the land will be returned
Ask for a restoration description that fits the existing site. Is the property farmland, a paved yard, vacant industrial land or part of a business? Identify the condition you expect when the project finishes and how completion would be checked.
Record existing features before work begins. Discuss photographs, surveys or other agreed records of roads, surfaces, drainage and buildings. Ask how damage caused by installation, maintenance or removal would be distinguished from conditions that were already there.
If you want to retain a road or another improvement, identify it in the agreement and ask which approvals and responsibilities would follow. Do not assume an item can remain merely because it is useful to you.
For a partial-property lease, consider the effect of removal on the rest of the site. Would contractors need access through a tenant’s yard or an operating business? Ask how notice, working hours, temporary space and repair would be handled.
Discuss who signs off on the work for public purposes and who verifies the private restoration obligation. Ask what happens if there is a disagreement about the finished condition or if further repairs are needed.
| Item to discuss | Question to resolve |
|---|---|
| Removal work | Which equipment, foundations and cables come out? |
| Financial guarantee | Who provides it and what can it pay for? |
| Stopped construction | Who secures and restores unfinished work? |
| Retained improvements | Which items can stay and who maintains them? |
| Property costs | What protects the owner if the operator defaults? |
Keep a state award separate from the offer for your land
NYSERDA’s September 2026 announcement lists contracted storage projects in Suffolk County, including Holtsville Energy Storage and KCE NY 37. It says payments begin after commercial operation and required permits and local approvals. The announcement is not a permit for another parcel or an invitation for every nearby landowner.
If a developer cites an award, ask how it relates to your offer. Is the land needed for that project, a route supporting it or an entirely separate proposal? Request the project name, signing company and drawing of the rights sought from you.
Ask about the actual connection route and the decisions still required. A named project or nearby electrical infrastructure cannot establish the connection, costs or commercial fit for your property.
Compare the reservation period with the work remaining. How long is the option, what is paid during it and which events allow extensions? Discuss when the land is released if the developer does not proceed, including the treatment of any testing or preparatory work.
Reference: NYSERDA: September 2026 contracted bulk-storage awards
Send the location and the use you want to preserve
Start with your name, email and phone number, then the property location. Tell Sunland whether you would consider a lease, sale or use of only part of the site.
Mention existing tenants, shared access, equipment already on the land or an agreement that may affect future use. If you have an offer or restoration plan, describe it and the questions you want answered. Acreage and parcel documents can follow later.
You do not need to prepare a removal estimate or settle the permit questions before inquiring. An inquiry does not reserve the property or authorize work. Further review must establish the current requirements, approvals, connection, rights and commercial fit.
Questions landowners ask
Does a removal bond cover every cost I could face?
Do not assume so. Review the guarantee, who can use it and the protections in your private agreement.
Should unfinished construction be covered in the agreement?
Yes. Ask who secures the site, repairs damage and restores unfinished work if the project stops.
Does a Suffolk County storage award qualify my property?
No. The actual parcel, project, connection and approvals require their own review.
Can I ask to retain an access road when the project ends?
Discuss it before signing. Identify the improvement and the approvals and maintenance responsibilities that would apply.
Sources & further reading
Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.