California landowner guide

What water-use records should change hands at a California data center?

California enacted AB 2619 on September 21, 2026. It takes effect January 1, 2027 and adds water-use disclosures to city and county business licensing for covered data centers. Before a sale, lease or operator change, find out which application will be due and whether the party signing it will have the records to support it.

Could my land work?

Ask the city or county licensing office whether the handover calls for an initial application, a renewal or another local filing. For an initial application covered by AB 2619, the owner or operator first sends projected water use to its water supplier and uses the same estimates on the local application. For a covered renewal, assemble the preceding calendar year’s total water use, direct water use by source and cooling system type. Arrange access to the underlying records before control changes.

Confirm which application is due

Get the existing business license or equivalent instrument, the name of its holder and the next renewal date. Tell the city or county which entity will own the facility and which entity will operate it after the handover. Ask which filing, if any, that particular change calls for and when the office expects it. AB 2619 ties the disclosures to initial and renewal applications for a business license, equivalent instrument or permit. It applies to charter cities as well and defines three types of data center, including facilities under two megawatts that meet the statutory definition.

In Santa Clara, the municipal code makes Business Tax Certificates nontransferable and provides for updates to city records for certain changes. Ask the local licensing office how it classifies your transaction and how it will collect the state disclosures for the applicable filing.

Illustration of a landowner reviewing property plans

Send initial projections to the supplier before filing locally

For a covered initial application once the law takes effect, the facility owner or operator provides its water supplier a good-faith estimate of expected use, anticipated water source and projected volume for the highest-use day, highest-use month and average year. The owner or operator reports those same estimates on the initial application to the city or county. Both disclosures are under penalty of perjury.

AB 2619 defines a water supplier as a community water system or an urban water supplier under the cited state codes. Identify the supplier for the facility and verify where it accepts the estimate. Ask the project team to preserve the calculations, their assumptions and a dated record of the supplier submission for the incoming operator.

Collect a full calendar year of records for renewal

When applying for a covered renewal, the owner or operator reports the preceding calendar year’s total and direct water use under penalty of perjury. Direct use covers onsite operations such as cooling, sanitation and irrigation and is identified by source, such as potable, nonpotable or recycled water. The direct-use report also identifies the cooling system type.

Ask the outgoing operator for supplier statements, meter logs, records of other onsite water sources and the cooling system description. Where a handover splits the reporting year, agree who will retain each period’s data and be available to resolve gaps. Ask the licensing office what it expects for a renewal that spans two operators or uses a mix of sources.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Put record delivery in the handover agreement

Before setting the handover date, have counsel capture the applicable filing, the proposed signer, each party’s record delivery date and access to supporting records after closing. Match those dates to the local filing schedule and ask what the outgoing operator will provide if a supplier statement arrives later.

Discuss a data center sale, lease or existing agreement

Sunland accepts data center property sale, lease and existing agreement assignment inquiries from owners and authorized representatives across the United States. Share the general location, your role and the proposed handover date. Keep water-use records and signed agreements for private follow-up.

Questions landowners ask

When do the California water reporting requirements take effect?

AB 2619 was enacted September 21, 2026 and takes effect January 1, 2027. Ask the licensing office which application and timing apply to your handover.

Who provides the disclosures when the landowner and operator are different?

The statute addresses a person who owns or operates the data center. Confirm the applying entity and authorized signer with the licensing office, then write down which party will supply the supporting records.

Which period should the incoming operator prepare for a renewal?

A covered renewal calls for the preceding calendar year. Collect records for that year and ask the licensing office how it wants the filing party to account for a change of operator during the reporting period.

Sources & further reading

Sources checked November 22, 2026. AB 2619 is enacted and takes effect January 1, 2027. Confirm the applicable filing and submission process with the local licensing office and water supplier for the site. Local rules and program details can change. Check the requirements for the actual project.