Arizona landowner guide

Who takes on a data center cooling retrofit after a sale?

Before selling an operating data center with a cooling retrofit requirement, find out which work must be complete before the buyer can occupy new space and who will pay for it. Chandler’s Frye Road project shows how a city can tie the retrofit to an expansion and make an amendment effective when it is recorded after the buyer’s deed.

Could my land work?

Gather the recorded development agreement and amendments, the equipment inventory, and the city’s permit and inspection records. Compare the buyer’s expansion plan with the cooling conditions for each phase. Then agree who will remove or replace the old equipment, what proof the parties need at closing, and who bears the cost if occupancy is delayed.

Match the recorded documents to the land and equipment

The recorded first amendment identifies Maricopa County document 20240483240 as the original recorded development agreement for 2500 West Frye Road. The City’s 2024 packet describes an existing data center with water-based cooling and a proposed expansion. Start with the recorded agreement’s legal description and compare it with the deed and site plan for the space and equipment you intend to sell.

Ask the operator for an equipment list that shows which cooling systems are still in use, which are ready to be removed and what serves each occupied space while work is underway. Ask Chandler Development Services which plans, inspections or other records show that the cooling condition has been met. Keep the equipment records with the permits and occupancy documents for the existing and proposed space.

Illustration of a landowner reviewing property plans

Separate the cooling requirement from the power schedule

Chandler’s 2024 rezoning ordinance requires removal of operating water-based systems before temporary or final occupancy of the proposed expansion. The recorded first amendment bars water-based cooling in the expansion and says the existing water-based systems must be replaced with mechanical systems that do not rely on evaporative cooling. Section 3(a) requires operating water-based systems to be removed or replaced before temporary expansion occupancy and fully removed before final occupancy of the property. Ask the City which inspections or permits document each condition for the buyer’s phase.

The recorded amendment keeps the cooling condition in place for phased temporary occupancy. During the first three years from the amendment’s effective date, a renewal is discretionary and requires Salt River Project certification that permanent infrastructure cannot supply sufficient energy for that phase. Ask the City for the occupancy record and its expiry date for each phase. Ask the utility for the current written service position for that phase.

The amendment also describes an option to build and equip two specified equipment yards before the expansion. Under section 3(b), electing this path triggers a three-year period from the amendment’s effective date for completing and equipping the yards. If the developer elects this path and proceeds to completion and equipping, the old systems must also be decommissioned and removed within that period. Ask for any documentation of the election and the date from the recorded amendment before using a deadline in your closing schedule.

Agree what escrow must receive and record

Section 4 of the first amendment instructed escrow to record it immediately after the buyer’s deed. Section 7 made recordation the effective date. The county recorded the deed as document 20250629554 and the first amendment immediately after it as 20250629555 on October 30, 2025. Order both instruments from title and ask for any later amendments if you are reviewing a new sale.

If a new sale depends on amended retrofit terms, ask counsel and the title company to identify what must be signed, deposited and recorded and when. The original City packet’s section 6 treats a buyer acquiring fee simple title as a permitted assignee and requires an express written assumption for an effective assignment. Ask counsel to check the recorded documents for the assumption, any required consent, and any separate release the seller wants.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Allocate the work and hand over proof

Put each outstanding item next to the party who will perform and pay for it. Include any required removal, replacement equipment, contractor access, and permit or inspection sign-off. If the seller is to finish a step before closing, name the document that will show completion and agree what happens if it arrives late.

If the buyer will finish the retrofit, identify the records and contracts it needs to take over the work. Share the location, current use and any known cooling or occupancy condition with Sunland when discussing a sale, lease or existing agreement affecting a U.S. property.

Questions landowners ask

Does the council vote establish the effective date?

Section 7 of the recorded first amendment ties effectiveness to recordation after the deed. Ask the title company for both recording references and a copy of the current agreement.

Does a power delay extend the cooling work automatically?

The recorded amendment addresses limited temporary occupancy renewals under specific conditions, including utility certification during the initial period. Ask the City to confirm the cooling and occupancy conditions that apply to the phase.

What evidence should I request if the buyer says the retrofit is complete?

Ask for the current equipment list, removal and commissioning records, and any City inspection or occupancy record that confirms how the applicable condition was satisfied.

Sources & further reading

Sources checked 2026-11-19. Local rules and program details can change. Check the requirements for the actual project.